GANG TUBE MNTING
8/14/2012
9CC3612.iam/
8D0350
3/4"X4"X10"
8K8430
8K8435
8X0306
3/4" LW
8X0260
3/4" N
8CC1005
8X0234
7/16" LNUT
8K1660
8X0044
7/16" X 3-1/2"
8X0368
1-1/2" FW
8CC1400
8CC1380 32' LEFT
8CC1390 32' RIGHT
36' LEFT
8CC1410 36' RIGHT
8CC1420 40' LEFT
8CC1430 40' RIGHT
8K5515
3/4 X 4 X 6"
(CENTER SECTION ONLY)
SECTION 2 – SET-UP OF DISK-CHISEL & COULTER-CHISEL CENTER SECTION (32’-40’)
2-28
– Install rectangular washer (8CC6035) with 1-1/4” lockwasher and nut onto bottom of caster
arm.
– Install hubs (8K1105S) as shown and retain with 1/2 x 3-3/4” bolt and nylock nut.
– Attach wheel and tire assemblies. Tighten lug nuts to 240 ft-lbs.
28. Tighten slotted nut (8X0292) so that caster wheel assembly cannot be moved by human force.
– Retain slotted nut with 3/8” hardware as shown.
29. Attach hitch to center with 1-1/2” x 10-5/8” pins.
NOTE: Center with 1-1/2” ID 10 GA flat washers.
30. Install 7/16x3-1/2” retaining bolts through hitch pivot pins. Secure with lock nuts.
31. Attach hydraulic hose holder and tip holder with 3/4 x 1-1/4” bolt and flat washer.
32. Attach hitch jack to jack spool.
Содержание CoulterChisel CC2815
Страница 6: ...NOTES iv ...
Страница 65: ...2 53 SECTION 2 INSTALLATION OF SHANKS AND COULTER GANGS ...
Страница 126: ...6 26 SECTION 6 PARTS ...
Страница 128: ...6 28 SECTION 6 PARTS ...
Страница 144: ...6 44 SECTION 6 PARTS NOTES ...