background image

 

©  2019 Sunman (Zhenjiang) Co., Ltd. All rights reserved. Specifications included in this manual are subject to change without notice. 

www.sunman-energy.com 

version 2019A      page5 / 18 

TM 

 

Do not attempt to disassemble eArche, and do not remove any attached nameplates or components 

from eArche. 

 

Do not apply paint or adhesive to eArche’ top surface. 

 

To avoid damage to the front cover and backsheet, do not scratch, “dent” or hit the front cover and 

backsheet.   

 

Do not drill holes in the ribs of SMA series. This may compromise the frame strength, cause corrosion 

of the ribs and void the warranty. 

 

Do  not  scratch  the  anodized  coating  of  the  ribs  (except  for  grounding  connection).  It  may  cause 

corrosion of the ribs or compromise the ribs strength. 

 

A  panel  with  broken  front plate or torn back  sheet  cannot  be repaired and  must not  be used  since 

contact with any panel surface or the ribs can cause an electric shock. 

 

Work only under dry conditions, and use only dry tools. Do not handle panels under wet conditions 

unless wearing appropriate protective equipment. 

 

When storing uninstalled panels outdoors for any period of time, always cover the panels and ensure 

that  the  front  cover  faces  down  “on  a  soft flat surface” to prevent  water  from  collecting  inside  the 

panel and causing damage to exposed connectors. 

 
 

Installation safety 

 

Never open electrical connections or unplug connectors while the circuit is under load. 

 

Contact with electrically charged parts of the panels, such as terminals, can result in burns, sparks and 

lethal shock whether or not the panel is connected. 

 

Do  not  touch  eArche  unnecessarily  during  installation.  The  front  surface  and  the  ribs  may  be  hot; 

there is a risk of burns and electric shock. 

 

Do not work in the rain, snow or in windy conditions. 

 

Avoid exposing cables to direct sunlight in order to prevent insulation degradation.   

 

Keep children well away from the system while transporting and installing mechanical and electrical 

components. 

 

Completely cover eArche with an opaque material during installation to prevent electricity from being 

generated. 

 

Do not wear metallic rings, watchbands, earrings, nose rings, lip rings or other metallic objects while 

installing or troubleshooting photovoltaic systems. 

 

Use only insulated tools that are approved for working on electrical installation. 

 

Follow the safety regulations for all other system components, including wires and cables, connectors, 

charging regulators, inverters, storage batteries, rechargeable batteries, etc.   

Содержание eArche PV System

Страница 1: ...eArche PV System Installation Manual TM...

Страница 2: ...his guide Features Benefits Notices General safety Handling safety Installation safety Fire safety Production Identification Mechanical Installation Grounding Electrical installation Disclaimer of lia...

Страница 3: ...on For any questions please contact SUNMAN s Customer Service Department or our local representatives for more detailed information Installers should follow all safety precautions described in this gu...

Страница 4: ...sunman energy com version 2019A page2 18 TM Features Benefits Flexible layouts eArcheTM PV system can be installed at any shape roofs which has integrated appearance with buildings Maximization insta...

Страница 5: ...equired for eArcheTM PV System PV arrays Copyright and Trademark Information Copyright 2019 by Sunman Zhenjiang Company Limited All rights reserved eArche and the SUNMAN logo are trademarks of Sunman...

Страница 6: ...esigned for outdoor use eArche can be ground mounted mounted on rooftops vehicles or boats The proper design of support structures lies within the responsibility of the system designers and installers...

Страница 7: ...ensure that the front cover faces down on a soft flat surface to prevent water from collecting inside the panel and causing damage to exposed connectors Installation safety Never open electrical conn...

Страница 8: ...pment or in places where flammable gases may be generated eArche have been rated Fire Class C and are suitable for mounting on to a Class A roof Production Identification Each eArche has two labels pr...

Страница 9: ...ion any roof penetration required to mount eArche must be properly sealed to prevent leaks Dust building up on the surface of eArche can impair with eArche performance SUNMAN recommends installing eAr...

Страница 10: ...teel roofing c Preparation of bonding material Please contact the local distributors for the detail information d Clean the color steel roofing Always keep the backsheet of SMD Series and rooftop clea...

Страница 11: ...A page9 18 TM following table eArche SMDxxxM 4X12DW SMDxxxM 4X12UW SMDxxxM 4X09DW SMDxxxM 4X09UW SMDxxxM 6X12DW SMDxxxM 6X12UW SMDxxxM 6X10DW SMDxxxM 6X10UW L 665mm 995mm f Layout of SMD Series Layout...

Страница 12: ...llation For SMA Series SMAxxxM 6X12DW SMAxxxM 6X10DW SMAxxxM 4X12DW SMAxxxM 4X09DW SMAxxxM 6X12UW SMAxxxM 6X10UW SMAxxxM 4X12UW SMAxxxM 4X09UW Clamps can be used for the connection of SMA series compo...

Страница 13: ...ect to change without notice www sunman energy com version 2019A page11 18 TM Layout For SMA Series SMAxxxM 6X12DW SMAxxxM 6X10DW SMAxxxM 4X12DW SMAxxxM 4X09DW SMAxxxM 6X12UW SMAxxxM 6X10UW SMAxxxM 4X...

Страница 14: ...use a recommended connector type for the grounding wire For grounding this guide refers to module frame grounding If grounding is required make sure module frames metal exposed to touch are always gr...

Страница 15: ...Sunman Zhenjiang Co Ltd All rights reserved Specifications included in this manual are subject to change without notice www sunman energy com version 2019A page13 18 TM For SMA Series Grounding layout...

Страница 16: ...stainless steel The star washer is fitted directly under the connection terminal and makes electrical contact by penetrating the anodized coating of the aluminum frame see the pictures below Recommend...

Страница 17: ...han two strings in parallel if eArche without any fuse or blocking diode to be connected according to the maximum series fuse rating of eArche and local electrical installation code There is no limita...

Страница 18: ...herence to this manual and the conditions or methods of installation operation use and maintenance of photovoltaic PV products are beyond SUNMAN s control SUNMAN does not accept responsibility and exp...

Страница 19: ...4X09DW 165 18 9 8 74 23 5 9 28 1503mm X 689mm X 5 6mm 3 7kg SMD160M 4X09DW 160 18 6 8 61 23 2 9 17 1503mm X 689mm X 5 6mm 3 7kg SMDxxxM 6X12UW SMD355M 6X12UW 355 39 5 8 99 48 1 9 51 2007mm X 1019mm X...

Страница 20: ...mm 5 0kg SMA160M 4X09DW 160 18 6 8 61 23 2 9 17 1479mm X 665mm X 35mm 5 0kg SMAxxxM 6X12UW SMA355M 6X12UW 355 39 5 8 99 48 1 9 51 1983mm X 995mm X 35mm 9 0kg 20A 16 SMA350M 6X12UW 350 39 2 8 93 47 9 9...

Отзывы: