background image

 

©  2019 Sunman (Zhenjiang) Co., Ltd. All rights reserved. Specifications included in this manual are subject to change without notice. 

www.sunman-energy.com 

version 2019A      page15 / 18 

TM 

penetrating  the  anodized  coating  of  the  aluminum  frame  (see  the  pictures  below).  Recommended 

Pan head tapping screws with cross recessed torque is 1 N•m. 

 
 

Electrical installation 

 

Any  hardware  used  must  be  compatible  with  the  mounting  structure  material  to  avoid  galvanic 

corrosion. 

 

It is not recommended to use eArche with different configurations in the same system. 

 

Excessive  cables  must  be  organized  or  fixed  in  an  adequate  way,  e.g.  attached  to  the  mounting 

structure by using non-metallic cable ties. 

 

For applications requiring high operating voltage several eArche can be connected in series to form a 

string of eArche; the system voltage is then equal to the sum of the voltage of each eArche. 

 

For  applications  requiring  high  operating  currents  several  strings  of  eArche  can  be  connected  in 

parallel; the system current is then equal to the sum of the current of each string of eArche. 

 

The maximum system voltage is 1000 volts DC. 

 

The  maximum  number  of  series  connected  eArche  depends  on  system  design,  the  type  of  inverter 

used and environmental conditions. 

 

Please make sure no more than two strings in parallel if eArche without any fuse or blocking diode to 

be connected according to the maximum series fuse rating of  eArche and local electrical installation 

code.   

 

There is no limitation on the number of eArche that can be connected in parallel (fuse for each string 

should  be  considered),  the  number  of  eArche  is  determined  by  system  design  parameters  such  as 

current or power output. 

 

To prevent the cables and the connectors from overheating, the cross section of  the cables and the 

capacity of  the  connectors  must be  selected to suit  the  maximum  system  short  circuit  current. The 

recommended cable is PV wire(temperature rating is 90

) with a cross section of at least 2.5mm². 

 

Please refer to local regulations to determine the system wires size, type and temperature. 

 

eArche are supplied with connectors to be used for system electrical connections. The recommended 

connectors are Multi Contact MC4, TL-Cable01 or equivalent, of which TL-Cable01 and Multi Contact 

MC4 are connectable. 

 

To  ensure  reliable  electric  connection  and  to  prevent  possible  intrusion  of  humidity,  Multi  Contact 

MC4 connectors and TL-Cable01 connectors must be mated and locked together until a click can be 

heard. 

 

Long-term  exposure  to  wet  environments  may  cause  connectors’  poor  connectivity,  resulting  in 

current  leakage  and  poor  conductivity.  SUNMAN  recommend  proper  connector/cable/wire 

management  to  prevent  moisture  intrusion.  Depending  on  the  amount  of  humidity,  SUNMAN 

Содержание eArche PV System

Страница 1: ...eArche PV System Installation Manual TM...

Страница 2: ...his guide Features Benefits Notices General safety Handling safety Installation safety Fire safety Production Identification Mechanical Installation Grounding Electrical installation Disclaimer of lia...

Страница 3: ...on For any questions please contact SUNMAN s Customer Service Department or our local representatives for more detailed information Installers should follow all safety precautions described in this gu...

Страница 4: ...sunman energy com version 2019A page2 18 TM Features Benefits Flexible layouts eArcheTM PV system can be installed at any shape roofs which has integrated appearance with buildings Maximization insta...

Страница 5: ...equired for eArcheTM PV System PV arrays Copyright and Trademark Information Copyright 2019 by Sunman Zhenjiang Company Limited All rights reserved eArche and the SUNMAN logo are trademarks of Sunman...

Страница 6: ...esigned for outdoor use eArche can be ground mounted mounted on rooftops vehicles or boats The proper design of support structures lies within the responsibility of the system designers and installers...

Страница 7: ...ensure that the front cover faces down on a soft flat surface to prevent water from collecting inside the panel and causing damage to exposed connectors Installation safety Never open electrical conn...

Страница 8: ...pment or in places where flammable gases may be generated eArche have been rated Fire Class C and are suitable for mounting on to a Class A roof Production Identification Each eArche has two labels pr...

Страница 9: ...ion any roof penetration required to mount eArche must be properly sealed to prevent leaks Dust building up on the surface of eArche can impair with eArche performance SUNMAN recommends installing eAr...

Страница 10: ...teel roofing c Preparation of bonding material Please contact the local distributors for the detail information d Clean the color steel roofing Always keep the backsheet of SMD Series and rooftop clea...

Страница 11: ...A page9 18 TM following table eArche SMDxxxM 4X12DW SMDxxxM 4X12UW SMDxxxM 4X09DW SMDxxxM 4X09UW SMDxxxM 6X12DW SMDxxxM 6X12UW SMDxxxM 6X10DW SMDxxxM 6X10UW L 665mm 995mm f Layout of SMD Series Layout...

Страница 12: ...llation For SMA Series SMAxxxM 6X12DW SMAxxxM 6X10DW SMAxxxM 4X12DW SMAxxxM 4X09DW SMAxxxM 6X12UW SMAxxxM 6X10UW SMAxxxM 4X12UW SMAxxxM 4X09UW Clamps can be used for the connection of SMA series compo...

Страница 13: ...ect to change without notice www sunman energy com version 2019A page11 18 TM Layout For SMA Series SMAxxxM 6X12DW SMAxxxM 6X10DW SMAxxxM 4X12DW SMAxxxM 4X09DW SMAxxxM 6X12UW SMAxxxM 6X10UW SMAxxxM 4X...

Страница 14: ...use a recommended connector type for the grounding wire For grounding this guide refers to module frame grounding If grounding is required make sure module frames metal exposed to touch are always gr...

Страница 15: ...Sunman Zhenjiang Co Ltd All rights reserved Specifications included in this manual are subject to change without notice www sunman energy com version 2019A page13 18 TM For SMA Series Grounding layout...

Страница 16: ...stainless steel The star washer is fitted directly under the connection terminal and makes electrical contact by penetrating the anodized coating of the aluminum frame see the pictures below Recommend...

Страница 17: ...han two strings in parallel if eArche without any fuse or blocking diode to be connected according to the maximum series fuse rating of eArche and local electrical installation code There is no limita...

Страница 18: ...herence to this manual and the conditions or methods of installation operation use and maintenance of photovoltaic PV products are beyond SUNMAN s control SUNMAN does not accept responsibility and exp...

Страница 19: ...4X09DW 165 18 9 8 74 23 5 9 28 1503mm X 689mm X 5 6mm 3 7kg SMD160M 4X09DW 160 18 6 8 61 23 2 9 17 1503mm X 689mm X 5 6mm 3 7kg SMDxxxM 6X12UW SMD355M 6X12UW 355 39 5 8 99 48 1 9 51 2007mm X 1019mm X...

Страница 20: ...mm 5 0kg SMA160M 4X09DW 160 18 6 8 61 23 2 9 17 1479mm X 665mm X 35mm 5 0kg SMAxxxM 6X12UW SMA355M 6X12UW 355 39 5 8 99 48 1 9 51 1983mm X 995mm X 35mm 9 0kg 20A 16 SMA350M 6X12UW 350 39 2 8 93 47 9 9...

Отзывы: