SULLIVAN-PALATEK__________________________________
iv
SECTION 6
MAINTENANCE ................................................................................................ 21
6.1
MAINTENANCE SCHEDULE .................................................................................................. 21
6.2
OIL FILTER .............................................................................................................................. 22
6.3
AIR FILTER ............................................................................................................................. 22
6.4
AIR/OIL SEPARATOR ............................................................................................................. 22
6.5
PRESSURE ADJUSTMENT .................................................................................................... 23
6.6
SERVICE/MAINTENANCE PROCEDURES ........................................................................... 23
6.7
TROUBLESHOOTING ............................................................................................................ 24
SCREW COMPRESSOR AIR-END EXCHANGE PROGRAM................................................... 28
SECTION 7
PARTS LIST ...................................................................................................... 29
7.1
PARTS ORDERING ................................................................................................................ 29
7.2
RECOMMENDED SPARE PARTS ......................................................................................... 29
7.3
DRIVE AND BASE ASSEMBLY – 125-250UD ....................................................................... 31
7.4
LUBRICATION AND COOLING SYSTEM – AIR COOLED – 125-250UD ............................. 33
7.5
LUBRICATION AND COOLING SYSTEM – WATER COOLED – 125-150UD ...................... 35
7.6
LUBRICATION AND COOLING SYSTEM – WATER COOLED – 200-250UD ...................... 37
7.7
INLET AND CAPACITY CONTROL SYSTEM – 125-250UD .................................................. 39
7.8
DISCHARGE SYSTEM – 125-150UD ..................................................................................... 41
7.9
DISCHARGE SYSTEM – 200-250UD ..................................................................................... 43
7.10
MICROPROCESSOR CONTROL – OPEN – 125-250UD ...................................................... 45
7.11
MICROPROCESSOR CONTROL – ENCLOSED – 125-250UD ............................................ 47
7.12
ENCLOSURE – AIR COOLED – 125-250UD ......................................................................... 49
7.13
ENCLOSURE – AIR COOLED – 200-250UD ......................................................................... 51
7.14
ENCLOSURE – WATER COOLED – 125-250UD .................................................................. 53
7.15
DECAL, T1 INSTRUCTIONS YASKAWA ............................................................................... 54
SECTION 8
WARRANTY ...................................................................................................... 55
SECTION 9
GENERAL ARRANGEMENT DRAWING ......................................................... 57
9.1
PIPING AND INSTALLATION DIAGRAM – 125-150UD ......................................................... 57
9.2
PIPING AND INSTALLATION DIAGRAM – 200-250UD ......................................................... 58
9.3
GENERAL ARRANGEMENT – AIR COOLED – OPEN – 125-250UD ................................... 59
9.4
GENERAL ARRANGEMENT – AIR COOLED – ENCLOSED – 125-150UD ......................... 60
9.5
GENERAL ARRANGEMENT – AIR COOLED – ENCLOSED – 200-250UD ......................... 61
9.6
GENERAL ARRANGEMENT – WATER COOLED – OPEN – 125-250UD ............................ 62
9.7
GENERAL ARRANGEMENT – WATER COOLED – ENCLOSED – 125-250UD .................. 63
SULLIVAN - PALATEK COMPRESSOR MAINTENANCE LOG............................................... 64
Содержание 125UD
Страница 2: ......
Страница 26: ...SULLIVAN PALATEK__________________________________ 26 NOTES ...
Страница 27: ...__________________________________SULLIVAN PALATEK 27 PARTS LISTING ...
Страница 30: ...SULLIVAN PALATEK__________________________________ 30 DRIVE AND BASE ASSEMBLY 125 250UD ...
Страница 31: ...__________________________________SULLIVAN PALATEK 31 7 3 DRIVE AND BASE ASSEMBLY 125 250UD ...
Страница 32: ...SULLIVAN PALATEK__________________________________ 32 LUBRICATION AND COOLING SYSTEM AIR COOLED 125 250UD ...
Страница 34: ...SULLIVAN PALATEK__________________________________ 34 LUBRICATION AND COOLING SYSTEM WATER COOLED 125 150UD ...
Страница 36: ...SULLIVAN PALATEK__________________________________ 36 LUBRICATION AND COOLING SYSTEM WATER COOLED 200 250UD ...
Страница 38: ...SULLIVAN PALATEK__________________________________ 38 INLET AND CAPACITY CONTROL SYSTEM 125 250UD ...
Страница 40: ...SULLIVAN PALATEK__________________________________ 40 DISCHARGE SYSTEM 125 150UD ...
Страница 42: ...SULLIVAN PALATEK__________________________________ 42 DISCHARGE SYSTEM 200 250UD ...
Страница 44: ...SULLIVAN PALATEK__________________________________ 44 MICROPROCESSOR CONTROL OPEN 125 250UD ...
Страница 45: ...__________________________________SULLIVAN PALATEK 45 7 10 MICROPROCESSOR CONTROL OPEN 125 250UD ...
Страница 46: ...SULLIVAN PALATEK__________________________________ 46 MICROPROCESSOR CONTROL ENCLOSED 125 250UD ...
Страница 48: ...SULLIVAN PALATEK__________________________________ 48 ENCLOSURE AIR COOLED 125 250UD ...
Страница 50: ...SULLIVAN PALATEK__________________________________ 50 ENCLOSURE AIR COOLED 200 250UD ...
Страница 52: ...SULLIVAN PALATEK__________________________________ 52 ENCLOSURE WATER COOLED 125 250UD ...
Страница 54: ...SULLIVAN PALATEK__________________________________ 54 7 15 DECAL T1 INSTRUCTIONS YASKAWA ...
Страница 58: ...SULLIVAN PALATEK__________________________________ 58 9 2 PIPING AND INSTALLATION DIAGRAM 200 250UD ...
Страница 59: ...__________________________________SULLIVAN PALATEK 59 9 3 GENERAL ARRANGEMENT AIR COOLED OPEN 125 250UD ...
Страница 60: ...SULLIVAN PALATEK__________________________________ 60 9 4 GENERAL ARRANGEMENT AIR COOLED ENCLOSED 125 150UD ...
Страница 61: ...__________________________________SULLIVAN PALATEK 61 9 5 GENERAL ARRANGEMENT AIR COOLED ENCLOSED 200 250UD ...
Страница 62: ...SULLIVAN PALATEK__________________________________ 62 9 6 GENERAL ARRANGEMENT WATER COOLED OPEN 125 250UD ...
Страница 63: ...__________________________________SULLIVAN PALATEK 63 9 7 GENERAL ARRANGEMENT WATER COOLED ENCLOSED 125 250UD ...