
__________________________________SULLIVAN-PALATEK
19
SECTION 5
OPERATION
5.1 INTRODUCTION
Read this entire Operator’s Manual to be familiar with the SULLIVAN-PALATEK Plant Air Compressor,
giving special attention to the SECTION 1 - SAFETY.
5.2 INITIAL
START
1. Open main disconnected to be sure there is no power to the compressor.
2. Review all the steps covered in SECTION 4 – INSTALLATION to be sure all instructions have been
complied with.
3. Inspect the compressor for any visible signs of damage that may have occurred during installation.
4. Check the compressor oil level. Check that the oil fill cap is tight.
5. Make sure the starter door is closed and latched.
WARNING: Do not power up the compressor starter with the starter door open!
6. Close the main disconnect; the compressor starter will now have power. The microprocessor will
boot, connect to the drive, then the display will illuminate and indicate line pressure.
WARNING: Reverse rotation will cause damage that is not covered by warranty. Rotation must be
checked whenever the motor has been disconnected.
7. Start the compressor by pushing the green “run” button.
8. With the service valve open, allow machine to pump up to normal operating pressures and observe
operation of automatic controls. Check for any possible leaks.
9. Check operation throughout the range of pressures, observing operating temperatures.
10. Push red “stop” button and check compressor oil level after it has been allowed to settle for a few
minutes. If it is necessary to add oil, be sure to open the main power disconnect, lock it out, and
relieve all oil separation tank pressure prior to removing fill cap to top off the tank.
11. If the control or unload pressures are incorrect, adjust the pressures in the microprocessor. Do NOT
raise the pressure without consulting the factory!
5.3 MICRO-PROCESSOR
PROGRAMMING; GENERAL INSTRUCTIONS
The operational menus normally addressed are P01 (operations), P02 (fault history), and P04
(maintenance setting). Access codes which are required to change settings are:
0009
for operational settings (P01), fault history (P02), real-time clock and pressure schedule
(P11)
0100
for service (P04) and everything else a service technician would need
The general procedures for accessing and changing parameters in the microprocessor are:
1. Simultaneously press the ‘up’ (+) & ‘down’ (-) keys. The access code screen will appear.
2. Press ‘enter’ to move forward a digit. Use ‘clear’ (C) to move back a digit.
3. Use ‘up’ (+) or ‘down’ (-) keys to select the correct number.
4. Once the correct access code is shown press ‘enter’ to access the menu pages.
5. Use the ‘up’ (+) and ‘down’ (-) keys to move through the menu pages.
6. Press ‘enter’ to view the list of corresponding parameters for the selected menu page.
7. Use the ‘up’ (+) and ‘down’ (-) keys to scroll through the parameters.
8. Press ‘enter’ to select the parameter to change.
9. Use the ‘up’ (+) and ‘down’ (-) keys to change the value of the parameter.
10. Press ‘enter’ to save the new value.
11. Press ‘clear’ (C) to move back to the previous page, or press and hold ‘reset’ (//) to return to the main
screen.
Содержание 125UD
Страница 2: ......
Страница 26: ...SULLIVAN PALATEK__________________________________ 26 NOTES ...
Страница 27: ...__________________________________SULLIVAN PALATEK 27 PARTS LISTING ...
Страница 30: ...SULLIVAN PALATEK__________________________________ 30 DRIVE AND BASE ASSEMBLY 125 250UD ...
Страница 31: ...__________________________________SULLIVAN PALATEK 31 7 3 DRIVE AND BASE ASSEMBLY 125 250UD ...
Страница 32: ...SULLIVAN PALATEK__________________________________ 32 LUBRICATION AND COOLING SYSTEM AIR COOLED 125 250UD ...
Страница 34: ...SULLIVAN PALATEK__________________________________ 34 LUBRICATION AND COOLING SYSTEM WATER COOLED 125 150UD ...
Страница 36: ...SULLIVAN PALATEK__________________________________ 36 LUBRICATION AND COOLING SYSTEM WATER COOLED 200 250UD ...
Страница 38: ...SULLIVAN PALATEK__________________________________ 38 INLET AND CAPACITY CONTROL SYSTEM 125 250UD ...
Страница 40: ...SULLIVAN PALATEK__________________________________ 40 DISCHARGE SYSTEM 125 150UD ...
Страница 42: ...SULLIVAN PALATEK__________________________________ 42 DISCHARGE SYSTEM 200 250UD ...
Страница 44: ...SULLIVAN PALATEK__________________________________ 44 MICROPROCESSOR CONTROL OPEN 125 250UD ...
Страница 45: ...__________________________________SULLIVAN PALATEK 45 7 10 MICROPROCESSOR CONTROL OPEN 125 250UD ...
Страница 46: ...SULLIVAN PALATEK__________________________________ 46 MICROPROCESSOR CONTROL ENCLOSED 125 250UD ...
Страница 48: ...SULLIVAN PALATEK__________________________________ 48 ENCLOSURE AIR COOLED 125 250UD ...
Страница 50: ...SULLIVAN PALATEK__________________________________ 50 ENCLOSURE AIR COOLED 200 250UD ...
Страница 52: ...SULLIVAN PALATEK__________________________________ 52 ENCLOSURE WATER COOLED 125 250UD ...
Страница 54: ...SULLIVAN PALATEK__________________________________ 54 7 15 DECAL T1 INSTRUCTIONS YASKAWA ...
Страница 58: ...SULLIVAN PALATEK__________________________________ 58 9 2 PIPING AND INSTALLATION DIAGRAM 200 250UD ...
Страница 59: ...__________________________________SULLIVAN PALATEK 59 9 3 GENERAL ARRANGEMENT AIR COOLED OPEN 125 250UD ...
Страница 60: ...SULLIVAN PALATEK__________________________________ 60 9 4 GENERAL ARRANGEMENT AIR COOLED ENCLOSED 125 150UD ...
Страница 61: ...__________________________________SULLIVAN PALATEK 61 9 5 GENERAL ARRANGEMENT AIR COOLED ENCLOSED 200 250UD ...
Страница 62: ...SULLIVAN PALATEK__________________________________ 62 9 6 GENERAL ARRANGEMENT WATER COOLED OPEN 125 250UD ...
Страница 63: ...__________________________________SULLIVAN PALATEK 63 9 7 GENERAL ARRANGEMENT WATER COOLED ENCLOSED 125 250UD ...