3
Every care is taken during product packaging by Sullair. It is advisable after carefully unpacking the dryer
to carry out a thorough visual inspection of the unit for any signs of transit damage incurred after leaving
our factory.
If any damage is found please report this immediately to the carrier and the distributor involved (if
applicable), or directly to Sullair.
1. General
Care must be taken to ensure that the dryer is not subject to flows (even peaks) in excess of the dryers
rated capacity.
The dryer must be vertical, and level, with the inlet at the bottom.
Position the dryer to allow safe maintenance and operation.
The dryer can be free standing or secured to the floor via the fastener points provided in the base.
The purge air flow is factory set for 6 Bar g (87 psi g) minimum system pressure. Should your minimum
pressure be lower, the purge air flow must be reset by trained Sullair personnel to maintain specified
dewpoint.
Suitably rated pipework and connections must be used during installation. All pipework must be secure and
safely positioned.
If required the exhaust assembly can be piped away, remote from the dryer.
SAR024 to SAR088 range
Two inlet port connections are available. Only remove the fitted sight glass from the port chosen as the
inlet to the dryer.
Two outlet port connections are available. Only remove the fitted sight glass from the port chosen as the
outlet side from the dryer.
Note: The remaining sight glass will adsorb moisture from the atmosphere and require replacing if the
outlet head is not piped up immediately.
SAR106 to SAR175 range
One port is available for the inlet to the dryer.
One port is available for the outlet from the dryer only. Remove the fitted plug.
Note: The sight glass will adsorb moisture from the atmosphere and require replacing if the outlet head is
not piped up immediately.
Dewpoint Dependent Switching (DDS) - Optional
The DDS system requires a sampling point to be inserted in the pipework at the outlet of the dryer,
downstream of the after-filter but before the isolation valve. P.T.F.E. tubing must be used to link the
sampling point to the 4mm push-in connector of the DDS system on the dryer.
2. Filtration
Sullair inlet and outlet filtration must be fitted to the dryer, e.g. MPF (recommended), an MPH grade
pre-filter and an Outlet filter - are included with the dryer. All filtration must be installed using the practices
described in the User Guide supplied with the filters.
3. UNPACKING
4. INSTALLATION (Refer to figure 1)
Содержание SAR024
Страница 2: ...LANGUAGE INDEX PAGE ENGLISH 1 8 DEUTSCH 9 16 FRANCAIS 17 24 ESPANOL 25 32 NOTES 33 35...
Страница 35: ...NOTES NOTIZEN REMARQUES NOTAS 33...
Страница 36: ...NOTES NOTIZEN REMARQUES NOTAS 34...
Страница 37: ...35 NOTES NOTIZEN REMARQUES NOTAS...