background image

Undercounter Installation

11

subzero.com/specs

Overlay Panel Installation

BEVERAGE CENTER MODEL UC-24BG

Inspect the overlay door panel for minimum thickness,

weight limit and finished inside edges. Decide if the handle

will be attached through the glass door frame or just

through the decorative door panel. If it is just through the

door panel, the handle must be attached first.

The overlay door panel is attached using #8 x

5

/

8

" square

drive screws passing through the door frame from the rear,

behind the gasket into the panel. The door panel is

marked for screw locations by the use of tenon centers,

which are temporarily inserted into the

1

/

4

" (6) diameter

holes in the front of the door frame. Refer to the illustration

below.

With the unit secured in place and the door closed, the

panel is held in the desired position on the door and

rapped by hand from the front, putting center marks on

the rear surface of the panel. If the door panel is made of

such a material that pre-drilling is needed, all of the

mounting holes should be marked. If not, only enough

holes to hold the panel in place temporarily, are necessary.

Remove the door panel from the door frame and remove

tenon centers. Open the door. Using the center marks to

locate screws, drive the screws into the panel through the

black tape on the door frame.

The screw holes inside the door are hidden under a cover

flap on the door gasket. It is necessary to lift the flap to

insert the screws. Use as many screws as necessary to

hold the door panel in place securely.

IMPORTANT NOTE:

After the first three or four mounting

screws are in place, but not completely tightened, close

the door and check the panel fit. This is the time to make

small adjustments. Once you are satisfied with the appear-

ance, open the door and add the rest of the screws.

Check all screws for tightness.

The metal frame on the door has numerous mounting

holes on each side of the door. This is to accommodate

Sub-Zero accessory handles and provide for easy attach-

ment of the handle through the door frame.

If you choose not to use the pre-drilled handle mounting

holes, it will be necessary to fasten the handle from the

rear of the door panel only, or drill one or more additional

holes through the metal frame of the door.

The cross-section illustration shows how the hole passes

through the door frame. The hole center is on the small

locator groove in the front of the frame. A

1

/

4

" (6) diameter

hole is made in the front wall of the extrusion and a

13

/

32

"

(11) diameter hole through the rest of the frame.

Tenon centers.

Door frame cross section.

GASKET

GLASS

13

/

32

"

(11)

DIAMETER

1

/

4

"

(6)

DIAMETER

OVERLAY

PANEL

DOOR

FRAME

TENON CENTER

Содержание Uc24crh

Страница 1: ...INSTALLATION GUIDE Undercounter Refrigeration...

Страница 2: ...parentheses are millimeters unless otherwise specified Important Note To ensure the safe and efficient installation of Sub Zero equipment please take note of the following types of highlighted informa...

Страница 3: ...uring the installation By reading these instruc tions carefully you will make the installation process easier problem free and most importantly safe Any questions or problems regarding the installatio...

Страница 4: ...OPENING HEIGHT TOP VIEW FRONT VIEW SIDE VIEW OPENING DIMENSIONS 237 8 606 24 610 34 864 4 102 253 8 645 23 8 60 Undercounter Models OVERALL DIMENSIONS Specifications INTERIOR CAPACITY R CU FT L F CU F...

Страница 5: ...pening Allow enough clearance in front of the unit for full door swing TOOLS AND MATERIALS REQUIRED Appliance dolly able to support 130 lbs 59 kg Level 2 6 m and 4 1 2 m recommended Phillips and slott...

Страница 6: ...ntly Plumbing Requirements Water Supply Line 1 4 OD copper line Water Pressure 20 100 psi 1 4 6 9 bar Excess Water Line for Connection 26 660 min FRONT VIEW SHADED AREA EXTENDS 1 2 13 FROM BACK WALL 1...

Страница 7: ...rse the procedure to reinstall the shelf Undercounter Installation 7 subzero com specs Before moving the undercounter unit into position protect any finished flooring with appropriate materials and se...

Страница 8: ...he door panel extends out from surrounding cabinets approximately 1 4 6 WATER LINE CONNECTION MODEL UC 24CI For model UC 24CI connect the plastic tubing from the ice maker to the household water line...

Страница 9: ...that will be visible through the glass must be finished Refer to the chart for panel specifica tions You may also use your own handle hardware to match sur rounding cabinetry If you do not use the pre...

Страница 10: ...2 screws provided Exercise caution when drilling holes for mounting hardware This is especially critical with inset panels Before attaching the overlay panel to the door insert two screws one in the...

Страница 11: ...ocate screws drive the screws into the panel through the black tape on the door frame The screw holes inside the door are hidden under a cover flap on the door gasket It is necessary to lift the flap...

Страница 12: ...ng holes in the door frame The nature of the door panel with a narrow outer rim and no connecting center member requires the support provided by the glass door After the door panel installation is com...

Страница 13: ...ured in place with the anti tip bracket Is the unit level Are all leveling legs making contact with the floor Is the kickplate installed properly Is the water supply connected model UC 24CI Have you c...

Страница 14: ...stomer service at 800 222 7820 When calling for service you will need the model and serial number of your unit Both numbers are listed on the product rating plate located inside the cabinet in the upp...

Страница 15: ...ll rights reserved Wolf Wolf Design Wolf Gourmet W Design and the color red as applied to knobs are registered trademarks and service marks of Wolf Appliance Inc Sub Zero Sub Zero Design Dual Refriger...

Страница 16: ...SUB ZERO INC P O BOX 44848 MADISON WI 53744 SUBZERO COM 800 222 7820 7020381 REV A 10 2010...

Отзывы: