![Stûv 30-up Скачать руководство пользователя страница 13](http://html1.mh-extra.com/html/stuv/30-up/30-up_installation-instructions-manual_1387450013.webp)
13
284 mm
7
5
6
4
a
b
8
9
10
max. 5 cm
Stûv 30-up - installation [en] - 0209
SN 68 719 > ...
Drill and position the pins (4 in the
ceiling and 1 in the wall, in the "V").
Put a screw into the "V". Do not
screw tight.
With a union the side of which is less
than 3.5 cm from the wall, a corner of
the flue union has to be cut [photo 3].
Leave 1 cm of material if possible.
Place everything (disc plate + support
+ flue union) on the screw [photo 5].
Please note: The flue union has
to be positioned with the holes to
allow condensation to escape facing
upwards. Fix to the ceiling. Use the
black screws with countersunk heads
[photo 6].
Fix to the wall. If necessary, use
wedges to compensate if the wall is
not vertical.
Fix the lower chamber support
284 mm from the upper support
[photo 7].
Go to page 17.
Configuration 2
Connection to a flue union extending
beyond the ceiling (5 cm maximum).
Connection set n°2 [figure 8] is made
up of:
– 1 Ø 180 flue union
– 1 finished ring [photo 10] made up
of the ring support [a] and the ring
itself [b]
– 1 Ø 180 adjustable connection
– 1 x 220 mm connection chamber
with supports
The union must not extend beyond
more than 5 cm. Cut it if necessary.