E/0618/35A/44
5.
Unpacking and Inspection
STULZ products are shipped ex-works. All units have been individually inspected in all their parts
and carefully packaged. Immediately inspect the unit upon receipt, making sure it has been
shipped in its proper position. Note improper shipment on the shipping document.
We recommend you accepting merchandise subject to inspection.
Check for damage and, if any, note this immediately on the shipping document. Remove packing
and check that the exterior casing is not scratched, marked or have signs of blows and that no
components are missing and that there are no traces of oil. Before throwing the packaging away
check that it does not contain documents or parts of the machine.
Any damage that is encountered must be notified to the carrier by registered letter within 8 days
of receipt. The carrier is responsible for any damage caused during shipment. STULZ is not
responsible for damage caused to the merchandise by the shipper but will do all in its power to
assist customers in these situations.
This product may not be returned without prior written approval by STULZ. For any
assistance please contact your local STULZ partner.
If installation of the product is not required immediately or the product needs to be
onforwarded to its final destination, replace it in its packing, after inspecting it, and
store it in a safe place.
As an environmental concern, we recommend to recycle the packing cartons and to
separate them from any plastic, read and follow instructions in chapter 11.
6.
Precautions and safety considerations
The units in the Tel-Air-2 family are designed to operate as a wall-type unit and in an upright
position. For all models the compressor is and must always be in an upright position. The cooling
units may not be used or transported in a position other than that for which they have been
designed.
Never run the machine if you have discovered leakage of the coolant fluid.
Содержание Tel-Air-2 Series
Страница 2: ......
Страница 18: ...E 0618 35A 18 Air flow diagram TLU units a unit size 2 is shown in these drawings COOLING FREE COOLING...
Страница 27: ...E 0618 35A 27 TLD F 40 TLD F 60 TLD F 80 TLD F 40 TLD F 80...
Страница 28: ...E 0618 35A 28 TLD F 90 TLD F A2 TLD F A4 TLD F 90 TLD F A4...
Страница 29: ...E 0618 35A 29...
Страница 30: ...E 0618 35A 30...
Страница 31: ...E 0618 35A 31...
Страница 37: ...E 0618 35A 37 Cut out TLF TLD 40 60 EXTERNAL OUTSIDE...
Страница 38: ...E 0618 35A 38 Cut out FLOOR TLD 40 60 FRONT SIDE REAR SIDE...
Страница 39: ...E 0618 35A 39 Cut out TLU 40 60 EXTERNAL OUTSIDE...
Страница 40: ...E 0618 35A 40 Cut out TLF TLD 80 A4 EXTERNAL OUTSIDE...
Страница 41: ...E 0618 35A 41 Cut out FLOOR TLD 80 A4 FRONT SIDE REAR SIDE...
Страница 42: ...E 0618 35A 42 Cut out TLU 80 A4 EXTERNAL OUTSIDE...
Страница 61: ...E 0618 35A 61...
Страница 62: ...E 0618 35A 62...
Страница 63: ...E 0618 35A 63...
Страница 64: ...E 0618 35A 64...
Страница 72: ......