16
min 0,5 m
1 m
1 m
min 0,5 m
EN/06.2017/G18D © STULZ GmbH – all rights reserved
cyberair 3PrO cw2 Original instructiOns
5. Installation
5.1 Selection of the installation site
The A/C unit is designed for the inside installation on a level base. The A/C unit is not appropriate for opera-
tion in office rooms or other rooms sensitive to noise.
DAnGer
risk of explosion
The unit may not be operated in an explosive atmosphere!
• children, unauthorized persons and animals may not have access to the installation site of the A/C unit.
• check that the installation site is appropriate for the unit weight, which you can read in the technical data.
• take into account the necessary clearances for the maintenance and the air flow.
Air intake area for Downflow units
Air outlet area for Upflow units without duct connection
Downflow unit
The A/C unit must be accessible from the front.
Maintenance clearance
upflow unit
The A/C unit must be accessible from the front and requires
space on the left and right side for the supply connections.
Electrical connection
Supply connections for:
- humidifier (optional)
Maintenance clearance
Clearance for chilled
water connection
Содержание ASD series
Страница 4: ...4 4 EN 06 2017 G18D STULZ GmbH all rights reserved CYBERAIR 3PRO CW2 ORIGINAL INSTRUCTIONS...
Страница 38: ......
Страница 62: ...10 EN 11 2016 STULZ GmbH all rights reserved air side connection...
Страница 66: ...4 EN 05 2017 STULZ GmbH all rights reserved raised floor stand...
Страница 71: ...5 STULZ GmbH all rights reserved EN 04 2017 electrical opTIONS Wiring diagram of the circuit board...