background image

STUDER INNOTEC

                                                                                                                                      

SI

 

User manual 

SI V3.0 E 

 9 

 

 

 

 
 
 

Option SI performance 3-phased 

Three SI inverters can be connected together to 
build a 3-phased grid. They have to be equipped 
with the PE option. 

Working  

Two ways of working are possible with the SI 
performance : 
 
1) Working alone 
One SI inverter can be used alone. The inverter 
works then as a single one, like it is described in 
this manual. 
 
2) Working in a grid 
Thanks to the connecting cable, three inverters 
can be connected together in order to obtain a 
3*400V 3-phased grid. 

 

 

 
Connecting 

 
1) Check that the inverters are in OFF position. 
 
2) First link together the neutral of all 3 devices 
by taking care that this connecting point be not 
further than 1 m from each inverter. 
 
3) Link together the battery cables (take care to 
not reverse the polarity). The 3 inverters have to 
be connected together to only one battery bank. 

Commissioning 

At the time of commissioning it is necessary to 
operate all the 3 inverters. The inverters work 
independently from each other and can be 
loaded in an asymmetrical way. They can work 
either in stand-by mode or in ON mode (see 
working description in this manual. 

 

Содержание SI 1212

Страница 1: ...User manual SI V3 0 E Sinewave inverter SI SERIES User s and Installer s Handbook STUDER INNOTEC Rue des Casernes 57 CH 1950 Sion Tel 41 0 27 205 60 80 Fax 41 0 27 205 60 88 info studer innotec com www studer innotec com ...

Страница 2: ...ment procedure 5 CONTROL 5 INDICATORS 5 Green Run LED 3 5 Red Fault LED 2 5 SAFETY 5 INTERNAL FUSE 5 OPTIONS 6 ALARM CONTACT 6 SOLAR CHARGE CONTROLLER 6 LED Charging 11 6 LED Bat 100 10 6 MAINTENANCE 6 LEGISLATION 6 LIMITATION OF LIABILITY 6 CE DECLARATION OF CONFORMITY 6 DESCRIPTION AND WIRING DIAGRAM 7 WIRING DIAGRAM FOR SI 600 800 S SOLAR CHARGE REGULATOR 8 SI PERFORMANCE ERREUR SIGNET NON DEFI...

Страница 3: ...rranty No current or tension generating devices public network generator may be connected to the output of the inverter because this could result in its destruction As for the usage of batteries follow the manufacturer s instructions Important After disconnecting the battery the output tension 230V may still remain for 30 seconds The ventilation of the device should never be obstructed Should the ...

Страница 4: ...ing the polarity in order not to damage the device Check that the connections are fixed correctly Use After connecting the inverter make sure the user devices are correctly plugged in and that there is no possible contact between the Line OUT 6 and a person The working device generates high tensions which could be fatal The inverter can be activated by moving the switch to the Auto position The on...

Страница 5: ...n the following ranges 11 4 V and 16 V in the 12 Volt models 22 8 V and 32 V in the 24 Volt models 45 6 V and 61 V in the 48 Volt models Outside these ranges the inverter is automatically disconnected These values correspond to a no load situation and they are automatically adjusted according to the current of the battery The internal temperature and the maximum power are also submitted to control...

Страница 6: ...on for control Legislation In all cases the assembly and installation must be done by qualified technicians observing the national requirements and rules stipulated You will find complete information about this in the relevant institutions Limitation of liability STUDER INNOTEC cannot control the installation use and maintenance of the inverter Thus we are not responsible for damages costs or loss...

Страница 7: ...STUDER INNOTEC SI User manual SI V3 0 E 7 Description and wiring diagram ...

Страница 8: ...STUDER INNOTEC SI User manual SI V3 0 E Wiring diagram for SI 600 800 S Solar charge regulator ...

Страница 9: ...d together in order to obtain a 3 400V 3 phased grid Connecting 1 Check that the inverters are in OFF position 2 First link together the neutral of all 3 devices by taking care that this connecting point be not further than 1 m from each inverter 3 Link together the battery cables take care to not reverse the polarity The 3 inverters have to be connected together to only one battery bank Commissio...

Страница 10: ...imum power 15 min 1 3 1 6 x Pnom 25 C Maximum power 3 min 1 6 2 x Pnom 25 C Peak power 5s 3 5 x Pnom Asymmetric load Up to 2 x Pnom Cos ϕ 0 1 1 Protections Overload Overheat Short circuit Reverse polarity by internal fuse IP protection index IP 20 complies with DIN 40050 IP 23 with top cover Forced ventilation From 45 C 3 C Overheating protection 75 C 3 C Required battery capacity 5x Pnom Unom rec...

Отзывы: