![Stryker EPIC II Скачать руководство пользователя страница 62](http://html.mh-extra.com/html/stryker/epic-ii/epic-ii_maintenance-manual_1385890062.webp)
Return To Table of Contents
62
2030-809-002 REV D
www.stryker.com
CPU BOARD REMOVAL AND REPLACEMENT
Tools Required:
•
T27 Torx
•
Needle-Nose Pliers
Procedure:
1. Run the litter to the full up position and remove the mattress from the bed.
2. Fold the foot section back toward the head end of the bed. Electrically run the knee section to full up. If the knee
section will not move electrically, pull the foot section toward the head end of the bed while pulling the CPR release
handle (located at the head end of the bed). The knee section will raise.
3. Using a T27 Torx, remove the four screws holding the cover to the actuator box and remove the cover.
4. Properly ground yourself (Refer to Static Protection Procedure).
5. Unplug all electrical connections from the CPU board.
6. Press the six stand off away from the board while gently lifting the board up and out.
7. Install the replacement CPU board.
Note
After the replacement CPU board is installed, a “burn-in” procedure must be performed for the Fowler and lift motor
potentiometers (Refer to Lift Potentiometer “Burn-in” Procedure and Fowler Potentiometer “Burn-in” Procedure).
If the bed is equipped with a scale system, the scale calibration procedure must also be performed after the replacement
CPU board is installed (Refer to Scale System Diagnostics and Calibration procedure).
Service Information
FOWLER POTENTIOMETER REPLACEMENT
Tools Required:
•
T27 Torx
•
Wire Cutters
•
1/2” Open End Wrench
•
7/64” Allen Wrench
Procedure:
1. Manually crank the knee section up until it stops.
2. Using a T27 Torx, remove the four screws holding the litter access cover to the litter and remove the cover.
3. Using a 7/64” Allen wrench, loosen the screw holding the linkage to the potentiometer shaft and remove the linkage
from the shaft.
4. Using a 1/2” open end wrench, remove the nut holding the potentiometer to the frame.
5. Using wire cutters, remove the cable ties from the cable. Unplug the cable from the CPU and remove the
potentiometer.
6. Reverse the above procedure to install the replacement potentiometer.
7. The new potentiometer must be calibrated after it has been installed.
8. The Fowler potentiometer should be set at 150Ω (±10Ω) in the full down position. This reading must be taken from
pins 3 and 4 on the connector with the potentiometer unplugged from the board. After the correct ohm reading is
achieved, tighten the screw on the linkage.
Содержание EPIC II
Страница 1: ...2016 09 D 1 2030 809 002 REV D www stryker com Maintenance Manual EPIC II Critical Care Bed REF 2030 ...
Страница 2: ......
Страница 71: ...Return To Table of Contents www stryker com 2030 809 002 REV D 71 Notes ...
Страница 77: ...Return To Table of Contents www stryker com 2030 809 002 REV D 77 Base Assembly and Options ...
Страница 78: ...Return To Table of Contents 78 2030 809 002 REV D www stryker com Base Assembly and Options ...
Страница 80: ...Return To Table of Contents 80 2030 809 002 REV D www stryker com Base Assembly and Options ...
Страница 96: ...Return To Table of Contents 96 2030 809 002 REV D www stryker com Notes ...
Страница 99: ...Return To Table of Contents www stryker com 2030 809 002 REV D 99 EPIC II PLUS Optional Base Assembly ...
Страница 100: ...Return To Table of Contents 100 2030 809 002 REV D www stryker com EPIC II PLUS Optional Base Assembly ...
Страница 105: ...Return To Table of Contents www stryker com 2030 809 002 REV D 105 Litter Assembly 2032 231 010 Reference Only ...
Страница 106: ...Return To Table of Contents 106 2030 809 002 REV D www stryker com Litter Assembly ...
Страница 107: ...Return To Table of Contents www stryker com 2030 809 002 REV D 107 Litter Assembly ...
Страница 108: ...Return To Table of Contents 108 2030 809 002 REV D www stryker com Litter Assembly ...
Страница 109: ...Return To Table of Contents www stryker com 2030 809 002 REV D 109 Litter Assembly ...
Страница 110: ...Return To Table of Contents 110 2030 809 002 REV D www stryker com Litter Assembly ...
Страница 111: ...Return To Table of Contents www stryker com 2030 809 002 REV D 111 Litter Assembly ...
Страница 112: ...Return To Table of Contents 112 2030 809 002 REV D www stryker com Litter Assembly ...
Страница 113: ...Return To Table of Contents www stryker com 2030 809 002 REV D 113 Litter Assembly ...
Страница 114: ...Return To Table of Contents 114 2030 809 002 REV D www stryker com Litter Assembly Applies to 2032 231 000 ...
Страница 120: ...Return To Table of Contents 120 2030 809 002 REV D www stryker com Notes ...
Страница 122: ...Return To Table of Contents 122 2030 809 002 REV D www stryker com Litter Assembly iBed Awareness Option Std Components ...
Страница 126: ...Return To Table of Contents 126 2030 809 002 REV D www stryker com Litter Assembly iBed Awareness Option Std Components ...
Страница 133: ...Return To Table of Contents www stryker com 2030 809 002 REV D 133 EPIC II PLUS Optional Litter Assembly ...
Страница 144: ...Return To Table of Contents 144 2030 809 002 REV D www stryker com EPIC II PLUS Optional 110V Outlet Assembly ...
Страница 146: ...Return To Table of Contents 146 2030 809 002 REV D www stryker com 110V Box Assembly 2035 031 220 ...
Страница 151: ...Return To Table of Contents www stryker com 2030 809 002 REV D 151 Head End Siderail Assembly CARRIER ARM ASSEMBLY ...
Страница 152: ...Return To Table of Contents 152 2030 809 002 REV D www stryker com Head End Siderail Assembly CARRIER ARM ASSEMBLY ...
Страница 171: ...Return To Table of Contents www stryker com 2030 809 002 REV D 171 Foot End Siderail Assembly ...
Страница 172: ...Return To Table of Contents 172 2030 809 002 REV D www stryker com Inside the U S and Canada Foot End Siderail Assembly ...
Страница 209: ...Return To Table of Contents www stryker com 2030 809 002 REV D 209 Optional Bed Extender Pad 2025 040 010 ...
Страница 226: ......
Страница 227: ......