![Stryker EPIC II Скачать руководство пользователя страница 18](http://html.mh-extra.com/html/stryker/epic-ii/epic-ii_maintenance-manual_1385890018.webp)
Return To Table of Contents
18
2030-809-002 REV D
www.stryker.com
Problem / Failure
Recommended Action
No bed down motion.
A. Enter diagnostics, (Refer to Scale System Diagnostics
and Calibration section) and press bed down.
a. If motion is not present, verify there is a two pin
shunt present on connector Y, closest to the center
of the bed, if not, install shunt.
1. Test bed down motion, if motion is present
then go to step D.
b. If motion is present, reburn lift potentiometer
limits, Refer to Lift Potentiometer Replacement
and Adjustment section for procedure.
B. Check for 5 VDC on TP 9 (HL) and TP 7 (FL) referencing
ground test point while pressing bed down.
a. If 5VDC is present, go to step C.
b. If 5VDC is not present, replace CPU board.
C. Check for 120VAC power on connector N (HL) and G
(FL), pin 1 (white) and pin 3 (black), of the CPU board,
while pressing bed motion up.
a. If voltage is not present, replace CPU board.
b. If voltage is present:
1. Verify the motors are running, if so, replace
lift couplers.
2. If motors are not running, check voltage at
motor connection.
3. If voltage is present at motor, check capacitors
or motors.
D. Verify bed function and return to service.
No bed up motion.
A. Enter diagnostics, (Refer to Scale System
Diagnostics and Calibration section) and press
bed up.
a. If motion is not present, go to step B.
b. If motion is present, reburn lift potentiometer
limits, refer to Lift Potentiometer Replacement
and Adjustment section for procedure.
B. Check for 5VDC on TP 10 (HL) and TP 8 (FL) on
the CPU board referencing ground test point while
pressing bed up.
a. If 5VDC is present, go to step C.
b. If 5VDC is not present, replace CPU board.
C. Check for 120VAC power on connector N (HL) and
G (FL), pin 1 (white) and pin 6 (red), of the CPU
board while pressing bed motion up.
a. If voltage is not present, replace CPU board.
b. If voltage is present:
1. Verify the motors are running, if so, replace
lift couplers.
2. If motors are not running, check voltage at
motor connection.
3. If voltage is present at motor, check
capacitors or motors.
D. Verify bed function and return to service.
Troubleshooting Guide
Содержание EPIC II
Страница 1: ...2016 09 D 1 2030 809 002 REV D www stryker com Maintenance Manual EPIC II Critical Care Bed REF 2030 ...
Страница 2: ......
Страница 71: ...Return To Table of Contents www stryker com 2030 809 002 REV D 71 Notes ...
Страница 77: ...Return To Table of Contents www stryker com 2030 809 002 REV D 77 Base Assembly and Options ...
Страница 78: ...Return To Table of Contents 78 2030 809 002 REV D www stryker com Base Assembly and Options ...
Страница 80: ...Return To Table of Contents 80 2030 809 002 REV D www stryker com Base Assembly and Options ...
Страница 96: ...Return To Table of Contents 96 2030 809 002 REV D www stryker com Notes ...
Страница 99: ...Return To Table of Contents www stryker com 2030 809 002 REV D 99 EPIC II PLUS Optional Base Assembly ...
Страница 100: ...Return To Table of Contents 100 2030 809 002 REV D www stryker com EPIC II PLUS Optional Base Assembly ...
Страница 105: ...Return To Table of Contents www stryker com 2030 809 002 REV D 105 Litter Assembly 2032 231 010 Reference Only ...
Страница 106: ...Return To Table of Contents 106 2030 809 002 REV D www stryker com Litter Assembly ...
Страница 107: ...Return To Table of Contents www stryker com 2030 809 002 REV D 107 Litter Assembly ...
Страница 108: ...Return To Table of Contents 108 2030 809 002 REV D www stryker com Litter Assembly ...
Страница 109: ...Return To Table of Contents www stryker com 2030 809 002 REV D 109 Litter Assembly ...
Страница 110: ...Return To Table of Contents 110 2030 809 002 REV D www stryker com Litter Assembly ...
Страница 111: ...Return To Table of Contents www stryker com 2030 809 002 REV D 111 Litter Assembly ...
Страница 112: ...Return To Table of Contents 112 2030 809 002 REV D www stryker com Litter Assembly ...
Страница 113: ...Return To Table of Contents www stryker com 2030 809 002 REV D 113 Litter Assembly ...
Страница 114: ...Return To Table of Contents 114 2030 809 002 REV D www stryker com Litter Assembly Applies to 2032 231 000 ...
Страница 120: ...Return To Table of Contents 120 2030 809 002 REV D www stryker com Notes ...
Страница 122: ...Return To Table of Contents 122 2030 809 002 REV D www stryker com Litter Assembly iBed Awareness Option Std Components ...
Страница 126: ...Return To Table of Contents 126 2030 809 002 REV D www stryker com Litter Assembly iBed Awareness Option Std Components ...
Страница 133: ...Return To Table of Contents www stryker com 2030 809 002 REV D 133 EPIC II PLUS Optional Litter Assembly ...
Страница 144: ...Return To Table of Contents 144 2030 809 002 REV D www stryker com EPIC II PLUS Optional 110V Outlet Assembly ...
Страница 146: ...Return To Table of Contents 146 2030 809 002 REV D www stryker com 110V Box Assembly 2035 031 220 ...
Страница 151: ...Return To Table of Contents www stryker com 2030 809 002 REV D 151 Head End Siderail Assembly CARRIER ARM ASSEMBLY ...
Страница 152: ...Return To Table of Contents 152 2030 809 002 REV D www stryker com Head End Siderail Assembly CARRIER ARM ASSEMBLY ...
Страница 171: ...Return To Table of Contents www stryker com 2030 809 002 REV D 171 Foot End Siderail Assembly ...
Страница 172: ...Return To Table of Contents 172 2030 809 002 REV D www stryker com Inside the U S and Canada Foot End Siderail Assembly ...
Страница 209: ...Return To Table of Contents www stryker com 2030 809 002 REV D 209 Optional Bed Extender Pad 2025 040 010 ...
Страница 226: ......
Страница 227: ......