Page 7 of 11
other pin. Attach the handle (#24) to the bracket on the side of the outer vertical post. Insert the bolt
(#10) from the inside. Slip on the washer (#14) and spring washer (#15) and secure with a nut (#11).
Make sure the pin (#18) holds the two ends. Repeat for the other post assembly.
Step 7
Tighten all the bolts and nuts securely and make sure that the entire crane assembly is tight and
secure.
Step 8
Test the crane according to the operating instructions in this manual and the ANSI/ASME B30.17
standards.
Operating Instructions
Step 1
Move the crane so that it is directly above the item to be lifted.
Step 2
Securely fasten the item to the crane with the appropriate trolley or hoist.
Step 3
Raising and lowering the crossbeam requires two people. There is a handle on each of the outer
vertical post assemblies. To raise the crossbeam, press the handle and the inner vertical post will
move up one hole. Insert the other pin into this hole to hold the position. Pull out the original pin and
hook the handle through the new positioned pin. Repeat this to reach the height needed. The inner
vertical post assembly has thirteen (13) different stop positions.
Maintenance
The gantry crane should be maintained daily, monthly, and every 12 months or after
overloading.
Only trained and qualified personnel should maintain the crane.
Clear a large enough area for maintenance, at least 1.5 times the span (L) and 2.5 times the
height of the crane's dimensions.
Land the load if it is attached to the crane.
All controllers shall be placed in the OFF position. Place warning signs and barriers around the
maintenance area.
Disassemble the crane, inspect all parts of it, and maintain as instructed in this manual.
Replace all roller pins used for locking. Also replace all damaged, worn, bent, and lost parts,
such as warning labels.