INSTALLATION
AND
COMMISSIONING
INSTRUCTIONS
Installation
and
commissioning
of
the
hoist
must
be
carried
out
by
a
competent
person(s).
We
recommend
that
installation
and
commissioning
are
carried
out
by
Street
Crane
Company
or
their
approved
agents.
Immediately
report
any
damage
which
may
have
occurred
during
transit.
Consult
with
the
manufacturer
/
supplier
and
repair
the
equipment
before
installation.
Do
not
install
damaged
equipment.
Use
only
original
Street
Crane
spare
parts
for
repairs.
Do
not
carry
out
any
alterations
or
modifications
to
the
hoist
either
prior
to
or
during
installation.
If
the
hoist
is
located
outdoors
we
recommend
that
a
small
cover
(roof)
is
fitted
to
the
runway
beam
to
protect
the
hoist
at
its
parking
position.
3.1
TRAVERSE
END
STOPS
Single
girder
4
&
8
fall
low
head
hoists
require
end
stops
to
be
mounted
on
either
end
of
the
runway
and
include
rubber
buffers
as
shown.
Weld
on
end
stops
can
be
provided
by
Street
Crane.
(Part
No.
270
‐
31).
Figure
2
–
Single
Girder
4
&
8
Fall
Traverse
End
Stops
Double
girder
crab
units
are
supplied
fitted
with
r
u
bber
buffers.
Suitable
end
stops
should
be
positioned
at
either
end
of
the
crab
rails.
Weld
on
end
stops
can
be
provided
by
Street
Crane.
(Part
No.
27
‐
20061).
Figure
3
–
Double
Girder
Traverse
End
Stops
Содержание ZX6
Страница 2: ......
Страница 4: ...defgh Street Crane Co Ltd IV THIS PAGE IS INTENTIONALLY BLANK ...
Страница 99: ...defgh Street Crane Co Ltd Ref D3256 rev B Page 99 of 103 NOTES ...
Страница 100: ...defgh Street Crane Co Ltd Page 100 of 103 Ref D3256 rev B NOTES ...
Страница 101: ......
Страница 102: ......