d
e
f
g
h
©
Street
Crane
Co
Ltd
Ref:
D3256
rev.
B
Page
11
of
103
5.
Disconnect
the
mains
switch
and
safeguard
against
unauthorised
powering
up,
by
placing
locks
and
warning
notices
in
the
appropriate
positions.
1
Some
maintenance
procedures
are
more
effectively
performed
with
power
to
the
equipment.
If
work
has
to
be
carried
out
on
live
parts,
an
additional
competent
person
must
be
available
to
actuate
the
power
isolating
switch
in
an
emergency.
Ensure
that
there
is
an
effective
manner
of
communication
between
personnel.
6.
To
avoid
injuries,
use
only
insulated
tools
and
equipment.
7.
On
completion
of
any
maintenance
work,
ensure
all
fixings,
guards,
covers,
drip
trays,
etc.
are
replaced.
1.4
MAINTENANCE
AND
INSPECTION
ACCESS
The
equipment
itself
may
have
no
provision
for
maintenance
access
or
it
may
be
fitted
with
full
or
partial
maintenance
access
platforms.
Where
no
or
only
partial
access
has
been
provided
on
the
equipment,
separate
or
additional
access
equipment
will
be
required
to
service
some
of
the
components.
These
components
should
be
accessed
via
a
secure,
mobile
or
temporary
structure
e.g.
tower
scaffold,
self
‐
standing
stair
platforms,
scissor
‐
lift
or
cherry
picker.
All
access
equipment
should
be
assembled
and
operated
by
trained
personnel
in
accordance
with
the
manufacturer’s
instructions
following
the
appropriate
health
and
safety
regulations
and
procedures.
The
following
should
be
considered
when
choosing
the
most
appropriate
type
of
maintenance
access
equipment.
Floor
space
available
for
the
access
equipment.
Working
height
above
floor
level.
Number
of
personnel
who
require
access
at
high
level.
Total
weight
of
any
parts
to
be
removed
/
replaced.
Provision
of
safety
harness
anchor
points
1.5
WARRANTY
/
REPLACEMENT
PARTS
The
warranty
will
become
invalid
if
the
instructions
for
installation,
operation
and
maintenance
instructions
contained
in
this
manual
are
not
followed.
Where
replacement
components
are
required
use
only
genuine
Street
Crane
parts.
Modifications
to
the
crane
or
any
of
its
mechanisms
should
not
be
carried
out
without
the
approval
of
Street
Crane
Company
Limited.
Failure
to
adopt
these
recommendations
will
invalidate
the
warranty
and
could
result
in
an
unsafe
condition.
Please
dispose
of
electrical
and
electronic
equipment
in
an
approved
and
environmentally
friendly
manner.
1.6
PERIODIC
TESTS
The
hoist
must
be
inspected
by
a
competent
person
at
least
once
a
year.
The
competent
person
may
consider
shorter
periods
to
be
more
appropriate
depending
on
the
duty
of
the
hoist.
A
record
of
the
results
of
the
test
should
be
kept
in
the
hoist
log
book,
section
7.7.
As
part
of
the
annual
test
the
remaining
service
life
of
the
hoist
should
be
established,
see
section
7.2.
1.7
STORAGE
If
the
hoist
is
to
be
placed
in
storage
for
any
period
of
time
ensure
that:
‐
The
hoist
is
covered
and
stored
indoors
in
a
heated
building.
Pack
the
hoist
clear
of
the
floor.
Raise
the
bottom
block
to
its
top
position
and
ensure
that
there
are
no
‘kinks’
in
the
wire
rope.
Ensure
all
electrical
switches
are
turned
to
the
OFF
position.
Always
fully
inspect
the
hoist
before
installing
and
putting
into
service.
1.8
TRAINING
AND
AFTER
SALES
SERVICE
If
required,
Street
Crane
Company
are
able
to
provide
trained
service
technicians
to
assist
in
inspection
and
maintenance
procedures
and
provide
operator
training.
Содержание ZX6
Страница 2: ......
Страница 4: ...defgh Street Crane Co Ltd IV THIS PAGE IS INTENTIONALLY BLANK ...
Страница 99: ...defgh Street Crane Co Ltd Ref D3256 rev B Page 99 of 103 NOTES ...
Страница 100: ...defgh Street Crane Co Ltd Page 100 of 103 Ref D3256 rev B NOTES ...
Страница 101: ......
Страница 102: ......