8.0 INSTALLATION
8.1
The boiler is delivered assembled, on a wooden crate with protection for transportation and site positioning.
Do not remove protection before final positioning.
8.2
The boiler jackets and control panel are fitted.
8.3 The following minimum clearances around the boiler, for installation and servicing purposes, are
recommend:
Above the top of the boiler (space for cleaning the flueways) 600mm, one side of the boiler should allow
access of 500mm.
In addition a minimum clearance of 350mm should be available at the front of the boiler to enable servicing
to be carried out.
8.4 BOILER
DIMENSIONS
GENEVA
‘C’
MODEL ‘C’
3 4 5 6 7 8 9
DIMENSIONS MM
L
365 450 600 750 750 900 900
P
600 600 600 650 650 705 705
Ø
A
1" 1" 1" 1
1/4"
1 1/4"
1 1/4"
1 1/4"
Ø
B
1" 1" 1" 1
1/4"
1 1/4"
1 1/4"
1 1/4"
Ø
C
1/2" 1/2" 1/2" 1/2" 1/2" 1" 1"
G
135 205 205 335 335 405 405
H
80 80 90 105 105 125 125
Ø
I
130 130 150 180 180 220 220
M
40 40 115 80 80 80 80
N
40 40 115 55 55 55 55
O
70 70 150 55 55 55 55
Q
160 160 160 150 150 150 150
R
540 540 540 550 550 550 550