STREBEL CIS
ASSEMBLY INSTRUCTIONS FOR:
STREBEL CIS
Page 7
V.1-03.08
Boiler erection.
Wall clearances.
There must be free space around the boiler to access the boiler for servicing
purposes. The space in front of the boiler must be of distance equal to 1.5 times
the depth (L).
Access at one side should be a minimum of 500mm allowing free movement to
the rear of the boiler again for servicing purposes.
These areas around the boiler must be kept free from debris, especially, free from
combustible materials.
Components required:
→
Number of sections: front, rear and from 3 to 12 intermediate sections
(according to boiler size).
→
Boiler nipples: 8 to 26 (according to boiler size).
→
Boiler sealing mastic.
→
Nipple jointing oil.
→
Tie bars.
→
Injector.
→
2 “ Plug
→
2” x 1/2” bush.
→
Thermometer pocket.
→
Thermostat poket.
→
1/2” self-closing valve for altitude (pressure) gauge.