background image

 

STREBEL CIS 

ASSEMBLY INSTRUCTIONS FOR: 

STREBEL CIS 

 

Page 3  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

V.1-03.08 

ASSEMBLY TOOL 

A bar Pulling up tool, which is returnable after assembly has been successfully 
completed, is made available for assembling the boiler block. 
The complete pulling up kit CIS/CISM consists of the following: 
 
1)  Pulling up flange at the top rear section 
1)  Pulling up flange at the bottom rear section 
1)  Pulling up flange at the intermediate section 
1)     Pulling up flange at the bottom front section 
4)     Pulling up flange at the top front section 
5)  Pulling up piping 
2.1)  Basic bar 
2.2)  Extension 
2.3)  End piece 
 
Case containing press tool 
3.1)  Free running ratchet spanner 
3.2)  Stop pins 
3.3)  Pulling up nut with thrust bearing 
Items needed for construction: flat chisel, mallet, brush, small round smoothing 
file, emery cloth, cleanser (e.g. petroleum), inspection lamp, spanner. 
 

Advice on the use of the pulling-up tools. 

 
1)  The pulling up flanges at the rear section are screwed onto the boiler flow 

and return connections. 

2)  The basic bars are inserted through the openings of the press flanges and 

ports so that the screw ends are situated out of the ports at the front. (The 
basic bars can be extended, as necessary.) 

3)  The pulling up flanges at the intermediate section or front section are pushed 

over the basic bar screw end from the front. 

4)  The Stop pins are inserted at the back through one of the transverse borings 

of the pulling up bar. 

5)  The pulling up nuts are screwed onto the basic bar screw end, from the front 

until they take up the slack on the pulling up tool flanges. 

6)  The free-running ratchet spanners are put on the starting nuts. 

 
Boiler base 

 
The boiler base is to be constructed in accordance with our base plans. The boiler 
block may stand on an iron frame set in concrete. The boiler base must stand on a 
level, non combustable base which is capable of supporting the weight of the 
boiler, water content and any ancillary equipment. These dimensions provide a 
50mm excess around the boiler jackets. 
 

 
 

 

 
 

 

STREBEL CIS 

ASSEMBLY INSTRUCTIONS FOR    

STREBEL CISM

STREBEL CISM 

No. of sections 

Width (B) (mm) 

Length (A) (mm)  Min. Thickness (mm) 

10 

904 

1862 

60 

11 

904 

2012 

60 

12 

904 

2162 

60 

13 

904 

2312 

60 

14 

904 

2462 

60 

15 

904 

2612 

60 

STREBEL CIS 

No. of sections 

Width (B) (mm) 

Length (A) (mm)  Min.Thickness (mm) 

850 

860 

60 

850

 

970 

60 

850 

1080 

60 

850 

1190 

60 

850 

1300 

60 

10 

850 

1410 

60 

11 

850 

1520 

60 

12 

850 

1630 

60 

13 

850 

1740 

60 

14 

850 

1850 

60 

Pulling-up tools 

Boiler base details 

Tool use 

Содержание CIS

Страница 1: ...a qualified heating specialist The boiler base is to be constructed in accordance with our diagrams Advantages of the STREBEL CIS AND CISM 1 Long life of cast iron boiler body 2 High efficiency of operation Efficiency of combustion is higher than 90 5 for all kinds of fuels 3 Possibility of delivery with burner 4 Modern design 5 Signalling of operation and defect of boiler 6 It is possible to orde...

Страница 2: ...7 BOILER ASSEMBLY BOILER BLOCK 8 9 FIXTURES 10 BURNER DOOR 10 UPPER FLUE WAY DOOR 10 BOILER JACKETS 10 FLUE HOOD 10 FLOW AND RETURN CONNECTIONS 10 INSTRUMENT CONTROL PANEL ASSEMBLY DESCRIPTION OF INSTRUMENT CONTROL PANEL 12 ASSEMBLING THE BURNER 12 INSTRUMENT CONTROL PANEL WIRING DIAGRAM 13 INSTRUMENT CONTROL PANEL TERMINAL DIAGRAM 14 BEFORE STARTING BOILER BURNER 15 FAULT FINDING 15 MAINTENANCE 1...

Страница 3: ... the front The basic bars can be extended as necessary 3 The pulling up flanges at the intermediate section or front section are pushed over the basic bar screw end from the front 4 The Stop pins are inserted at the back through one of the transverse borings of the pulling up bar 5 The pulling up nuts are screwed onto the basic bar screw end from the front until they take up the slack on the pulli...

Страница 4: ... ºC 90 Combustion Chamber Pressure mbar 2 Approx Flue Gas Temp ºC 185 Flue Gas Volume kg sec 0 053 0 065 0 077 0 088 0 100 0 112 0 124 0 136 0 148 0 149 Water Volume of Boiler litres 56 4 65 4 74 4 83 4 92 4 101 4 110 4 119 4 128 4 137 4 Combustion Chamber Volume cm 81 79 100 73 119 68 138 62 157 56 176 51 195 45 214 39 233 33 252 27 Hydraulic Resistance 10 C T mbar 0 20 0 24 0 25 0 31 0 37 0 43 0...

Страница 5: ...TREBEL CIS Page 5 V 1 03 08 STREBEL CIS Series Connection Dimensions 1185mm 125mm Flue spigot 220mm outside diameter Flow Return connections 80mm I d pipe Mating weldneck flanges supplied STREBEL CIS BOILER 80mm 275mm 670mm 95mm 945mm 1355mm ...

Страница 6: ...on Chamber Pressure mbar 0 9 1 4 2 2 3 2 5 6 2 Approx Flue Gas Temp ºC 165 190 Flue Gas Volume kg sec 0 088 0 100 0 120 0 135 0 156 0 180 Water Volume of Boiler litres 252 277 302 327 352 377 Combustion Chamber Volume cm 314 347 381 414 449 485 Hydraulic Resistance 20 C T mbar 0 90 1 35 1 90 2 60 3 34 4 20 10 C T mbar 3 40 3 90 5 30 8 60 12 40 16 70 Dimensions Height mm 1237 Width mm 904 Depth mm ...

Страница 7: ...00mm allowing free movement to the rear of the boiler again for servicing purposes These areas around the boiler must be kept free from debris especially free from combustible materials Components required Number of sections front rear and from 3 to 12 intermediate sections according to boiler size Boiler nipples 8 to 26 according to boiler size Boiler sealing mastic Nipple jointing oil Tie bars I...

Страница 8: ...ple ports must align exactly at all stages of the as sembly An inclined inserted nipple leads to leakage A boiler section is built on basically in three stages In addition certain specific points should be observed at each stage Stage 1 Drive nipple into boring with care Inspect nipple and boring for damage Smear linseed oil sealing compound over nipple and boring Gently drive nipple into flow and...

Страница 9: ...nuts and ratchet spanners tighten the starting nuts evenly C The clearance between the two sections must be equal when pulling up If clearance is unequal insert a flat chisel in the narrower point and continue pulling up until clearance is equal again Avoid using excessive force and smooth out excess mastic Add on only one section at a time in each case Further sections are added accordingly 7 On ...

Страница 10: ... FOR STREBEL CIS Page 10 V 1 03 08 Front view showing the first three intermediate sections after pulling up Front view showing the complete boiler block without the burner door or flue pass door Rear view of the complete boiler block ...

Страница 11: ... on the lower part of the front section I 4 Place burner door with insulation onto the eyelets and insert hinge pins 12 x 63 mm 5 Close burner door check alignment and tighten nuts M12 with washers 6 Attach burner flange plate onto burner door 7 Repeat procedure swapping eye bolt fixings with threaded bolts fitting the hinge on the right hand side if required Upper flue way door Use the same proce...

Страница 12: ...FOR STREBEL CIS Page 12 V 1 03 08 Completed boiler block with burner door and flue pass door hinged on the right Front view showing the side jackets and the doors bolted closed Top view showing insulation prior to fitting the top jacket ...

Страница 13: ...he slotted hole in the upper jacket to the control panel 5 Ensure unused holes in the control panel casing are plugged with rubber stoppers WARNING The length of the wires should be such that there is enough wire to fully open and close the burner door Assembling the burner 1 Only have the burner commissioned by a qualified combustion engineer Cables and pipes for electricity and oil should be fit...

Страница 14: ...RATURE LIMIT INDICATION LAMP 1 7 BOILER CONTROL THERMOSTAT STAGE 2 1 8 BURNER CONNECTORS 1 9 ROOM THERMOSTAT IF ROOM THERMOSTAT IS NOT FITTED LINK TERMINALS 9 10 T1 CONTROL CIRCUIT FEED T2 CONTROL CIRCUIT RETURN TO BOILER S3 BURNER LOCK OUT LAMP S4 STAGE 2 INDICATOR LAMP B4 HOURS RUN METER STAGE 1 B5 HOURS RUN METER STAGE 2 T6 HIGH LOW CONTROL CIRCUIT FEED T7 HIGH LOW CHANGEOVER CONTROL CIRCUIT T8...

Страница 15: ...ERATURE LIMIT INDICATION LAMP 1 7 BOILER CONTROL THERMOSTAT STAGE 2 1 8 BURNER CONNECTORS 1 9 ROOM THERMOSTAT IF ROOM THERMOSTAT IS NOT FITTED LINK TERMINALS 9 10 T1 CONTROL CIRCUIT FEED T2 CONTROL CIRCUIT RETURN TO BOILER S3 BURNER LOCK OUT LAMP S4 STAGE 2 INDICATOR LAMP B4 HOURS RUN METER STAGE 1 B5 HOURS RUN METER STAGE 2 T6 HIGH LOW CONTROL CIRCUIT FEED T7 HIGH LOW CHANGEOVER CONTROL CIRCUIT T...

Страница 16: ... due to excess temperature Maintenance Clean the boiler regularly proceed as follows Turn off mains switch and control Open burner door Clean heating gas flue ways and combustion chamber Close burner door and tighten nuts firmly Never tap water from the boiler for domestic use If the system is to be out of operation for an extended period of time clean the boiler thoroughly spray it out with a mix...

Страница 17: ...REBEL LTD 1F ALBANY PARK INDUSTRIAL ESTATE FRIMLEY ROAD CAMBERLY SURREY GU16 7PL TELEPHONE 01276 685422 FAX 01276 685405 E mail address info strebel co uk Website www strebel co uk THE COMPANY RESERVES THE RIGHT TO CHANGE SPECIFICATIONS AND DIMENSIONS WITHOUT NOTICE E O E ...

Отзывы: