STRATUS Floor Plate 2 post Lift Installation & Operation & Maintenance Instructions
23
5.10 Installation of power unit
•
Attach the power unit onto the bracket on the power side column;
•
Secure it using nuts M10X20, the locking washers D.10 and washers D. 10.
Fig.23
5.11 Connection of hydraulic hoses
Connect the longer hose in between the 2 cylinders, connect the short hose in between the cylinder and the power
unit. Please hand tighten to avoid thread damage, then use hand wrench to fasten completely. (Fig 24)
Fig.24
5.12 Make the electrical connection
Make sure all wiring are same as below circuit diagram (Fig 25).
Attention:
electrical system connection must be done by licensed electrician.
Warning
:
When installing the power cord for the first time, remove the test cable (short wire) from the motor
and replace it with a cable(wire) less than #12 gauge. The time interval between motor starts is at least
more than 2 seconds. Otherwise the motor or AC contactor may be burnt out.
Suggest to use min 30A breaker (not higher than the wire load).