Back Corner
Wall Panel
Front Corner
Wall Panel
Plain Rivets
Side Wall Channel
Mark the
shelf position
Rivet positions
Shelves
Top of Shed
Doorway
Channel
Back Wall
Plain Rivets
Top of Shed
Back Centre
Wall Panel
Assembled side
Top of Shed
Begin the installation by moving the front corner wall panel into
position against the back corner wall panel. The two panels
should lap as shown in Figure 1.
WALL AssembLy
Figure 1
Attach the side wall channels to both the top and bottom of the
corner wall using two plain rivets. The longer lip of the channel
should face the inside of the shed (Figure 2). Repeat both this
step and the previous step for the opposite wall.
Figure 2
Measure and mark the position of the shelves to suit your ideal
height and spacing requirements, ensuring that the shelves are
square using a level. The shelf position does not have to be mirrored
by the opposite side, a staggered layout may best suit your needs.
Fix the shelves to the inside of the wall panels with colour rivets
(rivet passing through from the outside of the shed) (Figure 3).
Figure 3
The doorway channels are fixed to the edge of both of the front
walls (adjacent to the proposed door) with two plain rivets (figure 4).
Lap the two assembled sides of the locker to the back centre wall
panel. Ensure the sheets lap as shown in Figure 5.
Figure 4
Figure 5