4. Initial set-up
4.1 Filling of the system pressure
At the initial start-up after the installation of the STRACK nitrogen gas spring systems, the
system must be filled.
Proceed as follows:
ATTENTION!
During all works at the STRACK nitrogen gas spring system, the applicable
operating safety regulation paragraph 3 must be considered.
The initial start-up and operation of the STRACK gas spring system must
exclusively be done by personnel which has been trained and instructed by
STRACK.
1. Drive the press in the top dead centre and stop it there.
2. Close the release valve of the
used control panel.
3. Connect the charging hose SN 2967 LS on the one side with the quick coupling
of the control panel and on the other side with the pressure reducer of the nitro
gen bottle.
Adjust the pressure reducer to maximal gas spring filling pressure, e.g. 150 bar.
(Continuation next page)