I
Control panels
2.
3.10
STRACK NORMA GmbH & Co. KG · Königsberger Str. 11 · D-58511 Lüdenscheid · Tel +49 2351 8701-0 · www.strack.de
08.2018
Control panels SN 2960 / SN 2962 / SN 2963 / SN 2965
4. Open the shut-off valve of the nitrogen bottle.
5. Open slowly the valve (1) at the charging hose.
Now fill the whole system with nitrogen. After the piston rods are completely
extended, you can continue to open the valve (1) at the charging hose to
accelerate the charging process.
Adjust the pressure how you need it later.
This pressure must lie between 50 and 200 bar.
Observe that the system pressure can slightly decrease after the initial filling due
to system constraints.
6. Close the valve (1) at the charging hose (2) as well as the valve at the nitrogen
bottle.
7. Decouple the charging hose from the control panel.
Now the system pressure is the same in all gas springs.
NOTE
Decouple the nitrogen bottle during the operation
of the gas spring system.
4.2 Modification of the system pressure of the gas springs
The control panels allow a simultaneously control of several gas springs.
(1)
(2)