Activity and Processes
H-10
StorageTek SL8500 User's Guide
short time frame to reduce cross contamination. The personnel performing this
operation should be fully trained to assess cable connectivity and priority. Each
exposed area of the subfloor void should be individually inspected and assessed for
possible cable handling and movement. All twist-in and plug-in connections should be
checked and fully engaged before cable movement. All subfloor activities must be
conducted with proper consideration for air distribution and floor loading. In an effort
to maintain access floor integrity and proper psychrometric conditions, the number of
floor tiles removed from the floor system should be carefully managed. In most cases,
each work crew should have no more than 24 square feet (six tiles) of open access
flooring at any one time. The access floor's supporting grid system should also be
thoroughly decontaminated, first by vacuuming the loose debris and then by
damp-sponging the accumulated residue. Rubber gaskets, if present, as the metal
framework that makes up the grid system should be removed from the grid work and
cleaned with a damp sponge as well. Any unusual conditions, such as damaged floor
suspension, floor tiles, cables and surfaces, within the floor void should be noted and
reported.
Activity and Processes
Isolation of the data center is an integral factor in maintaining appropriate conditions.
All unnecessary activity should be avoided in the data center, and access should be
limited to necessary personnel only. Periodic activity, such as tours, should be limited,
and traffic should be restricted to away from the hardware so as to avoid accidental
contact. All personnel working in the room, including temporary employees and
janitorial personnel, should be trained in the most basic sensitivities of the hardware
so as to avoid unnecessary exposure. The controlled areas of the data center should be
thoroughly isolated from contaminant producing activities. Ideally, print rooms, check
sorting rooms, command centers or other areas with high levels of mechanical or
human activity should have no direct exposure to the data center. Paths to and from
these areas should not necessitate traffic through the main data center areas.
Содержание SL8500
Страница 1: ...1 StorageTek SL8500 User s Guide E20869 12 March 2017...
Страница 12: ...xii...
Страница 16: ...Installing Web launched SLC 1 4 StorageTek SL8500 User s Guide...
Страница 22: ...Enabling Features on a Library with Firmware Before FRS_7 00 3 4 StorageTek SL8500 User s Guide...
Страница 26: ...Effect on HLI Hosts after Modifying the Capacity Configuration 4 4 StorageTek SL8500 User s Guide...
Страница 32: ...Maximizing Library Performance when Partitioning 5 6 StorageTek SL8500 User s Guide...
Страница 38: ...Guidelines for using CAPs 6 6 StorageTek SL8500 User s Guide...
Страница 46: ...Maximizing Library Performance Though Cartridge Placement 8 6 StorageTek SL8500 User s Guide...
Страница 62: ...Monitoring Library Events 12 6 StorageTek SL8500 User s Guide...
Страница 66: ...Rebooting a Robot 13 4 StorageTek SL8500 User s Guide...
Страница 80: ...A 2 StorageTek SL8500 User s Guide...
Страница 94: ...whereAmi B 14 StorageTek SL8500 User s Guide...
Страница 108: ...Firmware Upgrades with RE D 4 StorageTek SL8500 User s Guide...
Страница 138: ...World Wide Name Glossary 10...