26
6. Break the vacuum to (0 P.S.I.G.) with dry nitrogen, then
with an open port, replace the filter drier using the
appropriate brazing material. (Fig.37).
7. Once the filter drier has been replaced, repeat the
evacuation and recharging procedures.
Figure 37. Filter Drier Replacement
Open
Port
Ë
Ë
Ë
Ë
Ë
Содержание E157
Страница 1: ...Model E157 E257 F257 SERVICE MANUAL Manual No 513565 Rev 2 June 2003...
Страница 2: ......
Страница 4: ......
Страница 16: ...8...
Страница 28: ...20...
Страница 30: ...22...
Страница 40: ...32...
Страница 46: ...38 Figure 50 Model E157 Exploded View...
Страница 47: ...39 9 3 MODEL E157 PARTS LIST 718702 282012 SV...
Страница 48: ...40 Figure 51 Model E257 Exploded View...
Страница 49: ...41 9 4 MODEL E257 PARTS LIST 718702...
Страница 50: ...42 Figure 52 Model F257 Exploded View...
Страница 51: ...43 9 5 MODEL F257 PARTS LIST 282022 SV...
Страница 52: ...44...