Mounting instructions for surfboard „velis 2“ 

Item No. 51 5001 402

1000

500

450

508

556

 2000 

OHNE SCHRIFTLICHE ZUSTIMMUNG DER KAISER GMBH DARF DIESE 

TECHNISCHE UNTERLAGE WEDER VERVIELFÄLTIGT, NOCH DRITTEN MITGETEILT ODER 

ZUGÄNGLICH GEMACHT WERDEN, NOCH IN SONSTIGER WEISE MISSBRÄEUCHLICH VER- 

WENDET WERDEN. ZUWIDERHANDLUNGEN WERDEN URHEBERRECHTLICH VERFOLGT.

1

 

velis2

Benennung

Gepr.

Blatt

Datum

Projekt

Gez.

Zeichnungsnummer

1:20

A3

Name

Name

Fundamentplan

0303-00-00

Maßstab

Simonis

13.03.18

 

 

Gewerbegebiet Larsheck

56271 Kleinmaischeid

Deutschland

Beton

concrete

gewachsenes Erdreich

natural ground

Legende

stoßdämpfender Boden

shock-absorbing floor

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 
ES

11.05.20

stoßdämpfender Boden

A

Datum

Änderung

Rev

1.  Select the location of the play equipment taking into account the required 

minimum space (see diagram 3).

2.  The impact area of a playground equipment with an enforced movement is 

not allowed to overlap the impact area of other equipment. 

According to DIN EN 1176-1, 4.2.8.5.2 shock-absorbing floors must be made 

on the entire impact area of every equipment that cause forced movement.

3.  Carry out excavation work for the foundation as shown in diagram 2. After 

excavation compress the foundation floor.

 

Note: 

The surfboard is installed at play level.  

Pay attention to items marked „play level“ at play equipment! 

4.  Set up the concrete foundation according to diagram 2 with central, horizontal 

reinforcement. Pour the supplied foundation anchor in the foundation so that 

the upper angle frame is horizontal and flush with the foundation surface.

5.  After a setting period of 10 – 14 days, depending on weather conditions and 

foundation size, fill up and compress the holes between the foundation and 

the foundation hole with excavation.

Diagram 2: Foundation plan

Reinforcement plan: 

Concrete foundation with rein-

forcement
Main foundation: BSt 500S 
Stirrups Ø 8 mm lengthwise and cross 
Concrete cover h´= 3 cm
Concrete quality class C25/30

1000

500

450

508

556

 2000 

OHNE SCHRIFTLICHE ZUSTIMMUNG DER KAISER GMBH DARF DIESE 

TECHNISCHE UNTERLAGE WEDER VERVIELFÄLTIGT, NOCH DRITTEN MITGETEILT ODER 

ZUGÄNGLICH GEMACHT WERDEN, NOCH IN SONSTIGER WEISE MISSBRÄEUCHLICH VER- 

WENDET WERDEN. ZUWIDERHANDLUNGEN WERDEN URHEBERRECHTLICH VERFOLGT.

1

 

velis2

Benennung

Gepr.

Blatt

Datum

Projekt

Gez.

Zeichnungsnummer

1:20

A3

Name

Name

Fundamentplan

0303-00-00

Maßstab

Simonis

13.03.18

 

 

Gewerbegebiet Larsheck

56271 Kleinmaischeid

Deutschland

Beton

concrete

gewachsenes Erdreich

natural ground

Legende

stoßdämpfender Boden

shock-absorbing floor

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 
ES

11.05.20

stoßdämpfender Boden

A

Datum

Änderung

Rev

Play level

Foundation

Foundation anchor