State: 15.12.2020 p. 2
Mounting instruction climbing caterpillar „Tamino 1“
Item-No. 51 5559 601
© stilum GmbH, Gewerbegebiet Larsheck, D-56271 Kleinmaischeid • Tel. +49 (0) 2689 92790-0 • All rights and product modifications reserved
1. Select the location of the play equipment taking into account the required
minimum space (see diagram 6).
Note:
Due to possible overheating, do not
place the slide surface southernly.
2. The impact area of a playground equipment with an enforced movement is
not allowed to overlap the impact area of other equipment.
According to DIN EN 1176-1, 4.2.8.5.2 shock-absorbing floors must be made
on the entire impact area of every equipment that cause forced movement.
3. Carry out excavation work for the foundations as shown in diagram 2 and 4.
After excavation compress the foundation floor.
Note:
The combination equipment is built in on the play level. Pay attention
to items marked „play level” of play equipment!
4. Setup the foundations acc. to diagram 2 and 4 with central horizontal rein-
forcement. Insert the foundation anchors of the slide into the concrete mass
as shown in diagram 3.
5. After a setting period of 10 – 14 days, depending on weather conditions and
foundation size, fill up and compress the holes between the foundation and
the foundation hole with excavation.
6. Clean the surface of the foundations. Place the head of the catarpillar as
described in diagramm 1 and 5 onto the foundation.
Note: Do not screw the base plates onto the foundations yet!
7. Place the balance plate and the other hexagons according to the postitions in
diagram 5.
Reinforcement plan:
Concrete foundation with reinforcement
Foundation: BSt 500S
Stirrups Ø 8 mm lengthwise and cross
Concrete cover h´= 3 cm
Concrete quality class C 20/25
Diagram 2: Foundation plan
2980
R100
R100
4135
500
100
300
450
300
835
1843
2344
OHNE SCHRIFTLICHE ZUSTIMMUNG DER KAISER GMBH DARF DIESE
TECHNISCHE UNTERLAGE WEDER VERVIELFÄLTIGT, NOCH DRITTEN MITGETEILT ODER
ZUGÄNGLICH GEMACHT WERDEN, NOCH IN SONSTIGER WEISE MISSBRÄEUCHLICH VER-
WENDET WERDEN. ZUWIDERHANDLUNGEN WERDEN URHEBERRECHTLICH VERFOLGT.
1
Tamino 1
Benennung
Gepr.
Blatt
Datum
Projekt
Gez.
Zeichnungsnummer
1:40
A3
Name
Name
Fundamentplan
1013-00-00
Maßstab
Behnke
14.06.17
Gewerbegebiet Larsheck
56271 Kleinmaischeid
Deutschland
Beton
concrete
gewachsenes Erdreich
natural ground
Legende
stoßdämpfender Boden
shock-absorbing floor
B stoßdämpfender Boden
24.08.20 ES
SI
11.10.18
Rutschenfundament geän.
A
Datum
Änderung
Rev
2980
R100
R100
4135
500
100
300
450
300
835
1843
2344
OHNE SCHRIFTLICHE ZUSTIMMUNG DER KAISER GMBH DARF DIESE
TECHNISCHE UNTERLAGE WEDER VERVIELFÄLTIGT, NOCH DRITTEN MITGETEILT ODER
ZUGÄNGLICH GEMACHT WERDEN, NOCH IN SONSTIGER WEISE MISSBRÄEUCHLICH VER-
WENDET WERDEN. ZUWIDERHANDLUNGEN WERDEN URHEBERRECHTLICH VERFOLGT.
1
Tamino 1
Benennung
Gepr.
Blatt
Datum
Projekt
Gez.
Zeichnungsnummer
1:40
A3
Name
Name
Fundamentplan
1013-00-00
Maßstab
Behnke
14.06.17
Gewerbegebiet Larsheck
56271 Kleinmaischeid
Deutschland
Beton
concrete
gewachsenes Erdreich
natural ground
Legende
stoßdämpfender Boden
shock-absorbing floor
B stoßdämpfender Boden
24.08.20 ES
SI
11.10.18
Rutschenfundament geän.
A
Datum
Änderung
Rev
C
C
243
400
133
C-C
370
OHNE SCHRIFTLICHE ZUSTIMMUNG DER KAISER GMBH DARF DIESE
TECHNISCHE UNTERLAGE WEDER VERVIELFÄLTIGT, NOCH DRITTEN MITGETEILT ODER
ZUGÄNGLICH GEMACHT WERDEN, NOCH IN SONSTIGER WEISE MISSBRÄEUCHLICH VER-
WENDET WERDEN. ZUWIDERHANDLUNGEN WERDEN URHEBERRECHTLICH VERFOLGT.
Oberflächen nach
DIN ISO 1302
Reihe 2
Zul. Abweichung
DIN 2768 - mH
1
Tammy
Benennung
Gepr.
Werkstoff
Blatt
Datum
Projekt
Gez.
Zuschnitt
Zeichnungsnummer
Rev
Änderung
Datum
1:20
A3
Gewicht
Name
Name
Fundamentplan
1231-00-00
309.6
Maßstab
x
xx.xx.xx
Gewerbegebiet Larsheck
56271 Kleinmaischeid
Deutschland
Diagram 3: Foundation anchor of the slide