background image

State: 07.12.2020 p.  3

Mounting instructions for multiplay „silva 3“

Item-No. 51 5522 601

©  stilum GmbH, Gewerbegebiet Larsheck, D-56271 Kleinmaischeid  •  Tel. +49 (0) 2689 92790-0  •  All rights and product modifications reserved.

Diagram 2b: foundation plan top view

8.  Place the premounted  wendy house 1 and 2 on the connection plate (acc. 

to diagram 4a) and fix it with the screws, washers and cap nuts included in 

the delivery. The connection elements (see diagram 4c) for the wobble bridge 
have to face each other. The closed walls have to be on the outside.  

9.  Place the premounted constructions of the small post on the foundation on 

the position of wendy house 3 (see diagram 2b). Make sure that the connec-
tions for the rope rail face each other.

10. Place the premounted wendy house 3 on the connection plate (acc. to 

diagram 4a) and fix it with the screws, washers and cap nuts included in the 

delivery.

11.  Place the balance plates (see diagram 3b) between wendy house 1 and 3, so 

that the plates will make three stairs. 

Note: Do not screw the base plates onto the foundations yet!   

12. Mount the rope rail between wendy house 1 and 3 using the shackles inclu-

ded in the delivery.

 

13. Connect the climbing balls (diagram 3a), the sliding bow (diagram 3c) and the 

slide (diagram 3d) at the wendy houses as described in diagram 1, 4b and 4d 
and fasten it with the screws, washers and cap nuts included in the delivery. 

14. Connect the climbing net (diagram 3f) with the wendy house 3 at the intended 

locations acc. to diagram 4c and place the foundation plates on top of the 
foundation (diagram 2b). Please fasten the parts using the shackles included 
in the delivery.

15. Connect the wobble bridge as shown in diagram 3e with the wendy houses at 

the intended locations (diagram 4c) and fit it with the shackles included in the 

delivery.

B

B

1400

1400

1500

4200

600

600

600

1680

1280

305

695

1600

1000

600

2350

220

70

1315

350

920

2800

5800

3080

3300

350

1595

B-B

OHNE SCHRIFTLICHE ZUSTIMMUNG DER KAISER GMBH DARF DIESE 

TECHNISCHE UNTERLAGE WEDER VERVIELFÄLTIGT, NOCH DRITTEN MITGETEILT ODER 

ZUGÄNGLICH GEMACHT WERDEN, NOCH IN SONSTIGER WEISE MISSBRÄEUCHLICH VER- 

WENDET WERDEN. ZUWIDERHANDLUNGEN WERDEN URHEBERRECHTLICH VERFOLGT.

Oberflächen nach

DIN ISO 1302

Reihe 2

Zul. Abweichung

DIN 2768 - mH

2

 

silva3

Benennung

Gepr.

Werkstoff

Blatt

Datum

Projekt

Gez.

Zuschnitt

Zeichnungsnummer

Rev

Änderung

Datum

1:30

A3

Gewicht

Name

Name

Fundamentplan

1018-00-00

Maßstab

Behnke

24.03.17

 

 

A Standfüße gedreht

15.02.18 ES

 ES

16.12.19

Balancet.,Haus verschoben

B

ES

25.08.20

stoßdämpfender Boden

C

 

 

 

 

 

 

 

 

 

 

 

 

Gewerbegebiet Larsheck

56271 Kleinmaischeid

Deutschland

wendy 

house 1

wendy 

house 2

wendy 

house 3

Содержание silva 3

Страница 1: ...GmbH Gewerbegebiet Larsheck D 56271 Kleinmaischeid Tel 49 0 2689 92790 0 All rights and product modifications reserved Diagram 1 Overall view of the play equipment climbing balls rope rail climbing net wobble bridge wendy house 3 slide post sliding bow balance plate wendy house 1 wendy house 2 ...

Страница 2: ...562 2320 OHNE SCHRIFTLICHE ZUSTIMMUNG DER CONRADI KAISER GMBH DARF DIESE TECHNISCHE UNTERLAGE WEDER VERVIELFÄLTIGT NOCH DRITTEN MITGETEILT ODER ZUGÄNGLICH GEMACHT WERDEN NOCH IN SONSTIGER WEISE MISSBRÄEUCHLICH VER WENDET WERDEN ZUWIDERHANDLUNGEN WERDEN URHEBERRECHTLICH VERFOLGT 1 silva3 Benennung Gepr Blatt Datum Projekt Gez Zeichnungsnummer 1 35 A3 Name Name Fundamentplan 1018 00 00 Maßstab Behnk...

Страница 3: ...c and the slide diagram 3d at the wendy houses as described in diagram 1 4b and 4d and fasten it with the screws washers and cap nuts included in the delivery 14 Connect the climbing net diagram 3f with the wendy house 3 at the intended locations acc to diagram 4c and place the foundation plates on top of the foundation diagram 2b Please fasten the parts using the shackles included in the delivery...

Страница 4: ...nitt 1 15 Gewicht Name 41 5 Maßstab Diagram 3a attachment part climbing balls Diagram 3c attachment part sliding bow Diagram 3d attachment part slide Diagram 3e attachment part wobble bridge OHNE SCHRIFTLICHE ZUSTIMMUNG DER CONRADI KAISER GMBH DARF DIESE TECHNISCHE UNTERLAGE WEDER VERVIELFÄLTIGT NOCH DRITTEN MITGETEILT ODER ZUGÄNGLICH GEMACHT WERDEN NOCH IN SONSTIGER WEISE MISSBRÄEUCHLICH VER WEND...

Страница 5: ...and Diagram 4a connection wendy house B C D C 1 10 E Oberflächen nach DIN ISO 1302 Zul Abweichung DIN 2768 mH Benennung Werkstoff Datum Gez Zuschnitt Gewicht Name Explosion 795 4 Maßstab Simonis 22 01 19 B C D Diagram 4c connection wobble bridge climbing net Diagram 4d connection sliding bow climbing balls B B 1 20 C 1 10 D 1 10 E OHNE SCHRIFTLICHE ZUSTIMMUNG DER CONRADI KAISER GMBH DARF DIESE TEC...

Страница 6: ... installation has been finished Attention If the play equipment has been incompletely installed or partly dis mantled when carrying out maintenance and repair work this may lead to par ticular risks of injury for the user For this reason make clearly visible that the equipment shall not be used in such cases STAINLESS STEEL NOTE Play equipment which contain components made of stainless steel shoul...

Страница 7: ...ong soiling it is appropriate to clean the playground equipment at intervals of three to six months WOOD NOTE For all play equipment with wooden elements it cannot be ruled out that dry cracks may develop These natural changes of wood are dependent on climate conditions as well as on the age and usage of the play equipment Longer dry periods may lead to more dry cracks This development however doe...

Отзывы: