1.  Select the location of the play equipment taking into account the required 

minimum space (see diagram 5).  

Note: 

Due to possible overheating, do not 

place the slide surface southernly.

2.  The impact area of a playground equipment with an enforced movement is 

not allowed to overlap the impact area of other equipment. 

According to DIN EN 1176-1, 4.2.8.5.2 shock-absorbing floors must be made 

on the entire impact area of every equipment that cause forced movement.

3.  Carry out excavation work for the foundations as shown in diagram 2a and 

2b. After excavation compress the foundation floor.

 

Note:

The combination equipment is installed at play level. Pay attention to 

items marked „play level” at play equipment!

4.  Set up the concrete foundations according to diagram 2 with central, horizon-

tal reinforcement.

5.  After a setting period of 10 – 14 days, depending on weather conditions and 

foundation size, fill up and compress the holes between the foundation and 

the foundation hole with excavation.

6.  Clean the surface of the foundations and start with the installation of the play 

equipment. 

7.  Place the high posts (wendy house 1 and 2) as described in diagram 2b on 

the foundations.  

Note: Do not screw the base plates onto the foundations yet!

5804

 1591 

450

1456

992

3272

2802

4562

2320

OHNE SCHRIFTLICHE ZUSTIMMUNG DER KAISER GMBH DARF DIESE 

TECHNISCHE UNTERLAGE WEDER VERVIELFÄLTIGT, NOCH DRITTEN MITGETEILT ODER 

ZUGÄNGLICH GEMACHT WERDEN, NOCH IN SONSTIGER WEISE MISSBRÄEUCHLICH VER- 

WENDET WERDEN. ZUWIDERHANDLUNGEN WERDEN URHEBERRECHTLICH VERFOLGT.

1

 

silva3

Benennung

Gepr.

Blatt

Datum

Projekt

Gez.

Zeichnungsnummer

1:35

A3

Name

Name

Fundamentplan

1018-00-00

Maßstab

Behnke

24.03.17

 

 

Gewerbegebiet Larsheck

56271 Kleinmaischeid

Deutschland

Beton

concrete

gewachsenes Erdreich

natural ground

Legende

stoßdämpfender Boden

shock-absorbing floor

 

 

 

 

 

 

 

 

 

 

 

 

C stoßdämpfender Boden

25.08.20 ES

B Balancet.,Haus verschoben 16.12.19  ES

ES

15.02.18

Standfüße gedreht

A

Datum

Änderung

Rev

5804

 1591 

450

1456

992

3272

2802

4562

2320

OHNE SCHRIFTLICHE ZUSTIMMUNG DER KAISER GMBH DARF DIESE 

TECHNISCHE UNTERLAGE WEDER VERVIELFÄLTIGT, NOCH DRITTEN MITGETEILT ODER 

ZUGÄNGLICH GEMACHT WERDEN, NOCH IN SONSTIGER WEISE MISSBRÄEUCHLICH VER- 

WENDET WERDEN. ZUWIDERHANDLUNGEN WERDEN URHEBERRECHTLICH VERFOLGT.

1

 

silva3

Benennung

Gepr.

Blatt

Datum

Projekt

Gez.

Zeichnungsnummer

1:35

A3

Name

Name

Fundamentplan

1018-00-00

Maßstab

Behnke

24.03.17

 

 

Gewerbegebiet Larsheck

56271 Kleinmaischeid

Deutschland

Beton

concrete

gewachsenes Erdreich

natural ground

Legende

stoßdämpfender Boden

shock-absorbing floor

 

 

 

 

 

 

 

 

 

 

 

 

C stoßdämpfender Boden

25.08.20 ES

B Balancet.,Haus verschoben 16.12.19  ES

ES

15.02.18

Standfüße gedreht

A

Datum

Änderung

Rev

5804

 1591 

450

1456

992

3272

2802

4562

2320

OHNE SCHRIFTLICHE ZUSTIMMUNG DER KAISER GMBH DARF DIESE 

TECHNISCHE UNTERLAGE WEDER VERVIELFÄLTIGT, NOCH DRITTEN MITGETEILT ODER 

ZUGÄNGLICH GEMACHT WERDEN, NOCH IN SONSTIGER WEISE MISSBRÄEUCHLICH VER- 

WENDET WERDEN. ZUWIDERHANDLUNGEN WERDEN URHEBERRECHTLICH VERFOLGT.

1

 

silva3

Benennung

Gepr.

Blatt

Datum

Projekt

Gez.

Zeichnungsnummer

1:35

A3

Name

Name

Fundamentplan

1018-00-00

Maßstab

Behnke

24.03.17

 

 

Gewerbegebiet Larsheck

56271 Kleinmaischeid

Deutschland

Beton

concrete

gewachsenes Erdreich

natural ground

Legende

stoßdämpfender Boden

shock-absorbing floor

 

 

 

 

 

 

 

 

 

 

 

 

C stoßdämpfender Boden

25.08.20 ES

B Balancet.,Haus verschoben 16.12.19  ES

ES

15.02.18

Standfüße gedreht

A

Datum

Änderung

Rev

Diagram 2a: Foundation plan

Reinforcement plan: 

Concrete foundation with reinforcement

Foundation: BSt 500S 
Stirrups Ø 8 mm lengthwise and cross 
Concrete cover h´= 3 cm
Concrete quality class C20/25 – C25/30

play level

Содержание silva 3

Страница 1: ...GmbH Gewerbegebiet Larsheck D 56271 Kleinmaischeid Tel 49 0 2689 92790 0 All rights and product modifications reserved Diagram 1 Overall view of the play equipment climbing balls rope rail climbing net wobble bridge wendy house 3 slide post sliding bow balance plate wendy house 1 wendy house 2 ...

Страница 2: ...562 2320 OHNE SCHRIFTLICHE ZUSTIMMUNG DER CONRADI KAISER GMBH DARF DIESE TECHNISCHE UNTERLAGE WEDER VERVIELFÄLTIGT NOCH DRITTEN MITGETEILT ODER ZUGÄNGLICH GEMACHT WERDEN NOCH IN SONSTIGER WEISE MISSBRÄEUCHLICH VER WENDET WERDEN ZUWIDERHANDLUNGEN WERDEN URHEBERRECHTLICH VERFOLGT 1 silva3 Benennung Gepr Blatt Datum Projekt Gez Zeichnungsnummer 1 35 A3 Name Name Fundamentplan 1018 00 00 Maßstab Behnk...

Страница 3: ...c and the slide diagram 3d at the wendy houses as described in diagram 1 4b and 4d and fasten it with the screws washers and cap nuts included in the delivery 14 Connect the climbing net diagram 3f with the wendy house 3 at the intended locations acc to diagram 4c and place the foundation plates on top of the foundation diagram 2b Please fasten the parts using the shackles included in the delivery...

Страница 4: ...nitt 1 15 Gewicht Name 41 5 Maßstab Diagram 3a attachment part climbing balls Diagram 3c attachment part sliding bow Diagram 3d attachment part slide Diagram 3e attachment part wobble bridge OHNE SCHRIFTLICHE ZUSTIMMUNG DER CONRADI KAISER GMBH DARF DIESE TECHNISCHE UNTERLAGE WEDER VERVIELFÄLTIGT NOCH DRITTEN MITGETEILT ODER ZUGÄNGLICH GEMACHT WERDEN NOCH IN SONSTIGER WEISE MISSBRÄEUCHLICH VER WEND...

Страница 5: ...and Diagram 4a connection wendy house B C D C 1 10 E Oberflächen nach DIN ISO 1302 Zul Abweichung DIN 2768 mH Benennung Werkstoff Datum Gez Zuschnitt Gewicht Name Explosion 795 4 Maßstab Simonis 22 01 19 B C D Diagram 4c connection wobble bridge climbing net Diagram 4d connection sliding bow climbing balls B B 1 20 C 1 10 D 1 10 E OHNE SCHRIFTLICHE ZUSTIMMUNG DER CONRADI KAISER GMBH DARF DIESE TEC...

Страница 6: ... installation has been finished Attention If the play equipment has been incompletely installed or partly dis mantled when carrying out maintenance and repair work this may lead to par ticular risks of injury for the user For this reason make clearly visible that the equipment shall not be used in such cases STAINLESS STEEL NOTE Play equipment which contain components made of stainless steel shoul...

Страница 7: ...ong soiling it is appropriate to clean the playground equipment at intervals of three to six months WOOD NOTE For all play equipment with wooden elements it cannot be ruled out that dry cracks may develop These natural changes of wood are dependent on climate conditions as well as on the age and usage of the play equipment Longer dry periods may lead to more dry cracks This development however doe...

Отзывы: