background image

©  stilum GmbH, 56271 Kleinmaischeid  •  Tel. +49 (0) 2689 92790-0  •  All rights and product modifications reserved

State: 24.05.2017 p. 4

Mounting instructions for multiplay equipment „ascendo 1A“ Robinia

Item-No. 517501601

Diagram 4b: connection of the fireman‘s 

post and the sliding bow

pipe adapter

Diagram 4a: Connection of the 

climbing slant

Rev.:

Projekt:

BESTELL-NR:

ZG-NR:

BENENNUNG:

OHNE SCHRIFTLICHE ZUSTIMMUNG DER C KAISER GMBH DARF DIESE TECHNISCHE UNTERLAGE WEDER VERVIELFÄLTIGT 

NOCH DRITTEN MITGETEILT ODER ZUGÄNGLICH GEMACHT WERDEN NOCH IN SONSTIGER WEISE MISSBRÄEUCHLICH VERWENDET 

WERDEN. ZUWIDERHANDLUNGEN WERDEN URHEBERRECHTLICH VERFOLGT.

FREIG:

GEPR:

GEZ:

DATUM:

NAME:

WERKSTOFF



MAßSTAB:

OBERFLAECHEN NACH

DIN ISO 1302 REIHE 2

ZUL. ABWEICHUNG

DIN 2768 - mH

+0,3

-0,3

WERKSTUECKKANTEN

NACH DIN 6784

Gewerbegebiet Larsheck

56271 Kleinmaischeid

Deutschland

A3

0201-00-00

29.04.2016

Abmaße:

Fertigung:

x

x

Gewicht:

1573587.9

ascendo robinie2

Rev.:

Projekt:

BESTELL-NR:

ZG-NR:

BENENNUNG:

OHNE SCHRIFTLICHE ZUSTIMMUNG DER C KAISER GMBH DARF DIESE TECHNISCHE UNTERLAGE WEDER VERVIELFÄLTIGT 

NOCH DRITTEN MITGETEILT ODER ZUGÄNGLICH GEMACHT WERDEN NOCH IN SONSTIGER WEISE MISSBRÄEUCHLICH VERWENDET 

WERDEN. ZUWIDERHANDLUNGEN WERDEN URHEBERRECHTLICH VERFOLGT.

FREIG:

GEPR:

GEZ:

DATUM:

NAME:

WERKSTOFF



MAßSTAB:

OBERFLAECHEN NACH

DIN ISO 1302 REIHE 2

ZUL. ABWEICHUNG

DIN 2768 - mH

+0,3

-0,3

WERKSTUECKKANTEN

NACH DIN 6784

Gewerbegebiet Larsheck

56271 Kleinmaischeid

Deutschland

A3

0201-00-00

29.04.2016

Abmaße:

Fertigung:

x

x

Gewicht:

1573590.1

ascendo robinie2

10. Drill holes into all foundations and screw the play equipment into the 

foundations with the included heavy-duty dowels.                                

11.  Fill up  and compress the holes between the foundation and the found-

ation hole with the excavation. 

12. Seal the foundation with the safety cover required for the height of fall  

indicated.  

Critical drop height: 1700 mm.    

 

 

 

Recommended surface material: sand, wood chip, gravel, synth. fall 
protection. 

13. After 3 months, check the screws at the joints and retighten them if  

necessary.

14. Do not allow children to use the equipment before the installation has 

been finished.

Attention:

 If the play equipment has been incompletely installed or partly 

dismantled when carrying out maintenance and repair work, this may lead 
to
particular risks of injury for the user. For this reason, make clearly visible 
that the equipment shall not be used in such cases.

NOTE: 

Play equipment, which contain components made of stainless steel 

should not come with „normal“ steel parts in contact. Those steel parts 
may rub
off and leave small steel particles in combination with moisture brown rust 

stains. If such corrosion occur on stainless steel parts, they are fine to 

remove with an abrasive (240 grit).
Please take care when transporting and setting up the fact that the compo-

Содержание ascendo 1A

Страница 1: ...oduct modifications reserved State 24 05 2017 p 1 Mounting instructions for multiplay equipment ascendo 1A Robinia Item No 517501601 sliding bow tower climbing slant fireman s post Diagram 1 Overall view of play equipment with description of individual elements climbing net ...

Страница 2: ...oncrete foundation with reinforcement Main foundation BSt 500S Ever 4 stirrups Ø 8 mm lengthwise and cross Concrete cover h 3 cm Concrete quality class C 20 25 Foundations for attachment parts are no reinforced 450 400 850 A A 600 600 600 625 500 800 1050 400 1850 1750 1750 2285 800 550 875 300 A A OHNE SCHRIFTLICHE ZUSTIMMUNG DER CONRADI KAISER GMBH DARF DIESE TECHNISCHE UNTERLAGE WEDER VERVIELFÄ...

Страница 3: ...the delivery 7 Place the climbing slant at the shafts and fix it with the screws and the adapter for the pipes which are included in the delivery diagram 4a 8 Connect the climbing bow and the fireman s post according to diagram 4b at the adapters and screw it 9 Align the whole play equipment once more at the foundation and take care that every base plate is positioned in the center of the foundati...

Страница 4: ...NACH DIN ISO 1302 REIHE 2 ZUL ABWEICHUNG DIN 2768 mH 0 3 0 3 WERKSTUECKKANTEN NACH DIN 6784 Gewerbegebiet Larsheck 56271 Kleinmaischeid Deutschland A3 0201 00 00 29 04 2016 Abmaße Fertigung x x Gewicht 1573590 1 ascendo robinie2 10 Drill holes into all foundations and screw the play equipment into the foundations with the included heavy duty dowels 11 Fill up and compress the holes between the fou...

Страница 5: ... cloth moistened with a special liquid cleaner e g on phosphoric acid and rinse off with clear water after a short application time During cleaning with mild abrasive components only wipe over stainless steel surface in polishing direction For heavi ly soiled surfaces polishes can be used e g for cleaning chrome on cars or for greasy and oily dirt alcoholic cleaning agents and solvents e g ethyl a...

Отзывы: