Mounting instructions for multiplay equipment „ascendo 1A“ Robinia
Item-No. 517501601
4. After a setting period of 10-14 days, depending on weather conditions
and foundation size - clean the surface of the foundations and start
with the installation of the combination equipment.
5. Place the tower as shown in Diagram 2 at the main foundations and
do a rough aligning. Please take care that the connections für the
wclimbing net are positioned at the bigger foundation.
Note: Do not screw the base plates onto the foundations yet!
6. Connect the climbing net with the tower at the intended locations and
place the flat steel on top of the foundation. Please fasten the parts
using the screws including in the delivery.
7.
Place the climbing slant at the shafts and fix it with the screws and the
adapter for the pipes which are included in the delivery (diagram 4a).
8.
Connect the climbing bow and the fireman‘s post according to diagram
4b at the adapters and screw it.
9. Align the whole play equipment once more at the foundation and take
care that every base plate is positioned in the center of the foundation.
4900
7500
OHNE SCHRIFTLICHE ZUSTIMMUNG DER KAISER GMBH DARF DIESE
TECHNISCHE UNTERLAGE WEDER VERVIELFÄLTIGT, NOCH DRITTEN MITGETEILT ODER
ZUGÄNGLICH GEMACHT WERDEN, NOCH IN SONSTIGER WEISE MISSBRÄEUCHLICH VER-
WENDET WERDEN. ZUWIDERHANDLUNGEN WERDEN URHEBERRECHTLICH VERFOLGT.
Oberflächen nach
DIN ISO 1302
Reihe 2
Zul. Abweichung
DIN 2768 - mH
1
ascendo 1A
Benennung
Gepr.
Werkstoff
Blatt
Datum
Projekt
Gez.
Zuschnitt
Zeichnungsnummer
Rev
Änderung
Datum
1:30
A3
Gewicht
Name
Name
Draufsicht
1026-00-00
491.9
Maßstab
Mattheis
29.03.17
Gewerbegebiet Larsheck
56271 Kleinmaischeid
Deutschland
Diagram 3: Minimum space