background image

©  stilum GmbH, 56271 Kleinmaischeid  •  Tel. +49 (0) 2689 92790-0  •  All rights and product modifications reserved

State: 24.05.2017 p. 3

Mounting instructions for multiplay equipment „ascendo 1A“ Robinia

Item-No. 517501601

4.  After a setting period of 10-14 days, depending on weather conditions 

and foundation size - clean the surface of the foundations and start 
with the installation of the combination equipment.              

5.  Place the tower as shown in Diagram 2 at the main foundations and 

do a rough aligning. Please take care that the connections für the 
wclimbing net are positioned at the bigger foundation.  

Note: Do not screw the base plates onto the foundations yet!

6.  Connect the climbing net with the tower at the intended locations and 

place the flat steel on top of the foundation. Please fasten the parts 

using the screws including in the delivery.

7. 

Place the climbing slant at the shafts and fix it with the screws and the 

adapter for the pipes which are included in the delivery (diagram 4a). 

8. 

Connect the climbing bow and the fireman‘s post according to diagram 

4b at the adapters and screw it. 

9.  Align the whole play equipment once more at the foundation and take 

care that every base plate is positioned in the center of the foundation. 

4900

7500

OHNE SCHRIFTLICHE ZUSTIMMUNG DER KAISER GMBH DARF DIESE 

TECHNISCHE UNTERLAGE WEDER VERVIELFÄLTIGT, NOCH DRITTEN MITGETEILT ODER 

ZUGÄNGLICH GEMACHT WERDEN, NOCH IN SONSTIGER WEISE MISSBRÄEUCHLICH VER- 

WENDET WERDEN. ZUWIDERHANDLUNGEN WERDEN URHEBERRECHTLICH VERFOLGT.

Oberflächen nach

DIN ISO 1302

Reihe 2

Zul. Abweichung

DIN 2768 - mH

1

 

ascendo 1A

Benennung

Gepr.

Werkstoff

Blatt

Datum

Projekt

Gez.

Zuschnitt

Zeichnungsnummer

Rev

Änderung

Datum

1:30

A3

Gewicht

Name

Name

Draufsicht

1026-00-00

491.9

Maßstab

Mattheis

29.03.17

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Gewerbegebiet Larsheck

56271 Kleinmaischeid

Deutschland

Diagram 3: Minimum space

Содержание ascendo 1A

Страница 1: ...oduct modifications reserved State 24 05 2017 p 1 Mounting instructions for multiplay equipment ascendo 1A Robinia Item No 517501601 sliding bow tower climbing slant fireman s post Diagram 1 Overall view of play equipment with description of individual elements climbing net ...

Страница 2: ...oncrete foundation with reinforcement Main foundation BSt 500S Ever 4 stirrups Ø 8 mm lengthwise and cross Concrete cover h 3 cm Concrete quality class C 20 25 Foundations for attachment parts are no reinforced 450 400 850 A A 600 600 600 625 500 800 1050 400 1850 1750 1750 2285 800 550 875 300 A A OHNE SCHRIFTLICHE ZUSTIMMUNG DER CONRADI KAISER GMBH DARF DIESE TECHNISCHE UNTERLAGE WEDER VERVIELFÄ...

Страница 3: ...the delivery 7 Place the climbing slant at the shafts and fix it with the screws and the adapter for the pipes which are included in the delivery diagram 4a 8 Connect the climbing bow and the fireman s post according to diagram 4b at the adapters and screw it 9 Align the whole play equipment once more at the foundation and take care that every base plate is positioned in the center of the foundati...

Страница 4: ...NACH DIN ISO 1302 REIHE 2 ZUL ABWEICHUNG DIN 2768 mH 0 3 0 3 WERKSTUECKKANTEN NACH DIN 6784 Gewerbegebiet Larsheck 56271 Kleinmaischeid Deutschland A3 0201 00 00 29 04 2016 Abmaße Fertigung x x Gewicht 1573590 1 ascendo robinie2 10 Drill holes into all foundations and screw the play equipment into the foundations with the included heavy duty dowels 11 Fill up and compress the holes between the fou...

Страница 5: ... cloth moistened with a special liquid cleaner e g on phosphoric acid and rinse off with clear water after a short application time During cleaning with mild abrasive components only wipe over stainless steel surface in polishing direction For heavi ly soiled surfaces polishes can be used e g for cleaning chrome on cars or for greasy and oily dirt alcoholic cleaning agents and solvents e g ethyl a...

Отзывы: