Determining the actual total weight
–
Park the truck securely.
–
Determine the unit weights by reading the
truck nameplate and, if necessary, the at-
tachment (variant) nameplate and, if neces-
sary, by weighing the load to be lifted.
–
Add the determined unit weights to obtain
the actual total weight of the truck:
Tare weight (1)
+ Ballast weight (variant) (2)
+ Attachment net weight (variant)
+ Weight of the load to be lifted
+ 100 kg allowance for driver
= Actual total weight
–
Drive the truck with the forks forwards into
the lift without touching the shaft walls.
–
Park the truck securely in the lift to prevent
uncontrolled movements of the load or the
truck.
Driving on loading bridges
DANGER
Risk of accident if the truck crashes!
Steering movements can cause the tail end to veer
off the loading bridge towards the edge. This may
cause the truck to crash.
The lorry driver and the truck driver must agree on
the lorry's departure time.
–
Before driving across a loading bridge, ensure
that it is properly attached and secured and has a
sufficient load capacity (lorry, bridge etc.).
–
Drive slowly and with care on the loading bridge.
–
Ensure that the vehicle onto which you will be
driving is secured to prevent it from shifting and
that it can support the load of the truck.
6210_001-010
Use and Operation
4
Handling loads
98
60048011601 EN - 08/2020
Содержание RCG15
Страница 1: ...LPG forklift truck RCG15 RCG18 RCG20 Original instructions 4214 4215 4216 60048011601 EN 08 2020 ...
Страница 2: ......
Страница 4: ......
Страница 10: ......
Страница 11: ...1 Introduction ...
Страница 19: ...2 Safety ...
Страница 41: ...3 Information about the truck ...
Страница 50: ...Location of the decals Information about the truck 3 Location of the decals 40 60048011601 EN 08 2020 ...
Страница 52: ...Information about the truck 3 Location of the decals 42 60048011601 EN 08 2020 ...
Страница 53: ...4 Use and Operation ...
Страница 122: ...Use and Operation 4 Decommissioning 112 60048011601 EN 08 2020 ...
Страница 123: ...5 Maintenance ...
Страница 159: ...6 Technical datasheet ...
Страница 160: ...Dimensions Technical datasheet 6 Dimensions 150 60048011601 EN 08 2020 ...
Страница 168: ...Technical datasheet 6 Mast specifications 158 60048011601 EN 08 2020 ...
Страница 172: ......
Страница 173: ......
Страница 174: ...STILL GmbH 60048011601 EN 08 2020 ...
Страница 175: ...LPG forklift truck RCG15 RCG18 RCG20 Original instructions 4214 4215 4216 60048011601 EN 08 2020 ...
Страница 176: ......
Страница 177: ...7 Diagrams ...
Страница 179: ...Hydraulic diagram Diagrams 7 Hydraulic diagram 169 60048011601 EN 08 2020 ...
Страница 180: ...Diagrams 7 Hydraulic diagram 170 60048011601 EN 08 2020 ...
Страница 181: ......
Страница 182: ...STILL GmbH 60048011601 EN 08 2020 ...