Operation
4
General commissioning
Wheel nuts
WARNING
Wheel nuts can loosen after initial commissioning.
After the first eight operating hours, tighten the
wheel nuts to 195 Nm.
Support screws
The setting of the support screws must be
checked during initial commissioning and
each time maintenance is performed.
The setting dimension (1) is dependent on the
application of the truck and can be taken from
the load capacity diagram.
5231 804 2502 EN - 11/2017
47
Содержание MX-X
Страница 1: ...Original instructions Order picking truck MX X 2332 2334 5231 804 2502 EN 11 2017 ...
Страница 2: ......
Страница 7: ...1 Foreword ...
Страница 15: ...2 Safety ...
Страница 26: ...2 Safety Personal protective equipment 20 5231 804 2502 EN 11 2017 ...
Страница 27: ...3 Overview ...
Страница 45: ...4 Operation ...
Страница 90: ...4 Operation Parking decommissioning 84 5231 804 2502 EN 11 2017 ...
Страница 91: ...5 Regular care and maintenance ...
Страница 102: ...5 Regular care and maintenance Removing the control compartment hood 96 5231 804 2502 EN 11 2017 ...
Страница 103: ...6 Technical data ...
Страница 105: ...7 Special equipment ...
Страница 131: ......
Страница 132: ...STILL GmbH 5231 804 2502 EN 11 2017 ...