![STIEBEL ELTRON SBP 100 Скачать руководство пользователя страница 5](http://html1.mh-extra.com/html/stiebel-eltron/sbp-100/sbp-100_operation-and-installation_1377124005.webp)
EN
GL
ISH
www.stiebel-eltron.com
SBP 100|
25
INSTALLATION
Safety
INSTALLATION
7. Safety
Only a qualified contractor should carry out installation, commis-
sioning, maintenance and repair of the appliance.
7.1 General safety instructions
We guarantee trouble-free function and operational reliability only
if original accessories and spare parts intended for the appliance
are used.
7.2 Instructions, standards and regulations
Note
Observe all applicable national and regional regulations
and instructions.
8. Appliance description
8.1 Standard delivery
The following are delivered with the appliance:
- 2 wall mounting brackets
- Mounting panel
- Quick-action air vent valve G 1/2
- Connector with sensor well for return temperature sensor
8.2 Accessories
8.2.1 Required accessories
Various safety assemblies are available for sealed unvented (pres-
surised) operation, depending on the supply pressure. These
type-tested safety assemblies protect the appliance against un-
acceptable excess pressure.
8.2.2 Further accessories
Booster heater
The flanged immersion heater is intended for retrofitting.
Compact heat pump installations
Compact heat pump installations are heat pump system compo-
nents that have been especially designed for the SBP 100 cylinder.
Circulation pumps are available as required accessories for com-
pact heat pump installations which are approved for direct con-
nection to the heat pump manager:
- UP 25/7.0 E, part number 232942
- UP 25/7.5 E, part number 232943
9. Preparations
9.1 Installation site
The appliance is designed for installation on a solid wall. Ensure
the wall offers adequate load bearing capacity.
Always install the appliance vertically in a room free from the risk
of frost. The room must be at least 2200 mm high.
9.2 Fitting the wall mounting bracket / mounting
panel
The appliance can be mounted on the wall mounting bracket or,
with clearance to the wall, to the mounting panel.
Observe the minimum clearances to the heat pump.
45°
52
350
756
880
≥
2200
280
≥
100
562
510
510
282
1
2
D
00000
48
22
4
1 Mounting panel
2 Heat pump
f
f
Mark out the holes to be drilled on the wall (see chapter
"Specification / Dimensions and connections").