7.1 Water connection
!
Material damage
With non-pressurised water heaters, observe the max-
imum permissible flow rate when the tap is fully open
(see chapter "Specification / Data table").
f
f
If the flow rate is exceeded, install the supplied but-
terfly valve in the cold water line.
!
Material damage
The water heater can leak.
f
f
Never subject the water heater to water pressure.
f
f
Do not interchange the connection hoses.
Note
Ensure that the connection hoses are not kinked or under
tension during installation.
26
_0
2_
10_
02
72
f
f
Connect the short connection hose to the angle valve of the
cold water supply line.
f
f
Connect the long connection hose marked blue to the "Cold
water inlet" connection on the water heater.
f
f
Connect the long connection hose marked red to the "DHW
outlet" connection on the water heater.
8. Commissioning
f
f
Thoroughly flush the cold water supply line.
f
f
Filling the water heater: Pull the lever upwards and pivot it
to the left.
f
f
Wait until water flows from the outlet, then switch on the
water heater.
9. Specification
9.1 Dimensions and connections
MEW
95
Ø10
Ø45
G 1/4
Ø63
35-50
135
20°
75
133
≥
180
350
450
33,5
0-40
G 3/8
D
00000
28
97
9
MEWC
0 - 50
450
Ø10
Ø44
Ø33,5
98
350
95
130
225
150
G 3/8
D
00000
31
59
5