42
| LWZ 304 Trend | LWZ 404 Trend | LWZ 304 Integral
www.stiebel-eltron.com
INSTALLATION
Maintenance and cleaning
10.5 Cleaning the filter ball valve
26
0
4
01
0
61
4
f
f
Close the filter ball valve by turning it 90° clockwise.
f
f
Undo the cap.
f
f
If the filter element is contaminated, connect a short hose for
backwashing.
f
f
Place the free end of the hose in a bucket.
f
f
Turn the filter ball valve 15° clockwise.
f
f
Turn the filter ball valve 15° back again.
f
f
Check whether cleaning was successful. Repeat backwashing
if required.
f
f
Refit the cap.
f
f
Open the filter ball valve by turning it 90° anti-clockwise.
f
f
Check the system fill pressure and adjust if required.
10.6 Replacing the anode
f
f
Isolate the appliance from the power supply.
f
f
Close the shut-off valve in the cold water supply.
f
f
Remove the cover from the cylinder module.
f
f
Remove the l.h. front panel of the cylinder module.
f
f
Briefly open the lowest DHW draw-off point.
1
D
00000
39
62
0
1 Drain connection of the DHW cylinder
f
f
At the DHW cylinder drain valve, draw off approx. 20 litres of
water.
1
2
D
00000
59
86
6
1 Anode connection at the cylinder
2 Anode
f
f
Pull the anode cable plug from the anode.
f
f
Remove the anode by turning it.
f
f
Insert a new anode. Alternatively, you can also use a seg-
mented anode.
f
f
Push the plug of the anode cable back onto the anode.
f
f
Open the shut-off valve in the cold water line.
f
f
Vent the DHW pipework at the respective DHW draw-off
points.
Содержание LWZ 304 Integral
Страница 1: ...INSTALLATION Central ventilation unit with heat recovery LWZ 304 Integral LWZ 304 Trend LWZ 404 Trend ...
Страница 54: ...54 LWZ 304 Trend LWZ 404 Trend LWZ 304 Integral www stiebel eltron com NOTES ...
Страница 55: ...ENGLISH www stiebel eltron com LWZ 304 Trend LWZ 404 Trend LWZ 304 Integral 55 NOTES ...