7
“
A
SSEMBLY
I
NSTRUCTIONS
”
S
TEP
4
–
Pedal Support Arm & Pedal Arm Assembly
a. Attach the
Right Pedal Arm (13)
onto the
Right Pivoting Arm (9)
and secure
with one
Bolt (M10xp1.5x85mm)(116)
and
one
Nylon Nut (M10xp1.5)(126).
b. Attach the
Right Pedal Support Arm (11)
onto the
Right Pivoting Arm (9)
and secure
with one
Bolt
(M10xp1.5x70mm)(115)
and
one
Nylon Nut (M10xp1.5)(126).
c. Repeat the above same procedure on the left side.
NOTE:
Make sure the bolts and nuts are fully tightened before moving to the next step.
S
TEP
5
–
Front Decoration Cover Assembly
a. Please go back to fully tighten with 2pcs
Bolts (M10xp1.5x50mm)(117)
and 2pcs
Nylock
Nuts (M10xp1.5)(125)
with the
T-Handle SOCKET WRENCH (17mm)
as shown on the right.
b. Attach the
Front Decorative Cover (19)
onto the front of the
Main Frame (1)
with 2pcs
Bolts
(M5xp0.8x30mm)(101).
NOTE: Please make sure Bolt
(115) is inserted from the inside of
the Pivoting Arm and the Nut (126)
is installed from the outside
Содержание PR-8523
Страница 30: ...29 PRODUCT PARTS DRAWING A...
Страница 31: ...30 PRODUCT PARTS DRAWING B...