![Stevens POGO Скачать руководство пользователя страница 5](http://html1.mh-extra.com/html/stevens/pogo/pogo_installation-manual_1375886005.webp)
Step 3: Mount Brackets to
Power/Communication Box
1. Remove plastic extension tabs and
hardware from plastic bag.
2. Attach the extension tabs, as shown
in illustration 5-1, to the box. Leave
slightly loose to adjust and line up
holes with mounting brackets before
tightening.
3. Mount top and bottom metal
brackets, as shown in illustration 5-2.
4. Be sure you mount as shown so that
both the top and bottom bracket
have the UBolt holes visible
5