6
FAU C E T I N S TA L L AT I O N
Step 3 – Connecting the water supply
1. a. Connect the flexible pipe to the
water supply.
b. For models with temperature control
connect the red flexible pipe to the hot
water supply and the blue flexible pipe
to the cold water supply.
2. Make sure that the filter(s) is/are
installed between the flexible pipe and the
shut off valve (angle valve) (not supplied).
3. Turn on the central water supply and
the shut-off valves (angle valves).
4. Check for leaks.
Step 4 - Connecting the power source
1. Connect the power source:
a. For battery versions: install the battery’s box at the wall underneath the sink using
the two sided adhesive foam faucete. The cable connection must point down. (You
can use an optional extension cable in order to assemble the battery box up to 10ft.
away from the sink. See section ”Spare parts”)
b. For transformer versions: Plug the transformer into the electricity socket and
connect the connectors.
2. Wait a few seconds before
activating the faucet.
3. If the range is unsatisfactory,
refer to the section titled “Range
adjustment”.