background image

16

Figure 10A - Horizontal Intake/Vent Locations

Figure 11 - Vertical Vent Installation                                                                              

Figure 11A - Horizontal Vent Installation                                                                     

Содержание QVSF 100

Страница 1: ...aks or loose fasteners may occur It is the installer s responsibility to inspect and correct any problems that may be found RECEIVING INSTRUCTIONS Inspect shipment immediately when received to determi...

Страница 2: ...ardous situation which if not avoided may result in minor injury or property damage NOTICE Used to notify of special instructions on installation operation or maintenance which are important to equipm...

Страница 3: ...in accordance with local codes or in absence of local codes with the latest edition of ANSI Standard Z223 1 N F P A No 54 National Fuel Gas Code All of the ANSI and NFPA Standards referred to in thes...

Страница 4: ...C Hanging Distance Width 14 3 4 17 1 2 17 1 2 20 1 4 23 25 3 4 28 1 2 34 39 1 2 45 375 445 445 514 584 654 724 864 1003 1143 D Discharge Opening Width 15 3 8 18 1 8 18 1 8 20 7 8 23 5 8 26 3 8 29 1 8...

Страница 5: ...e to the enforcing authorities PUBLIC GARAGES In repair garages unit heaters must be at least 8 feet 2 4m above the floor Refer to the latest edition of NFPA No 88B Repair Garages In parking structure...

Страница 6: ...es 635mm is required The distance between the flue collector and any combustible must be no less than 6 inches 152mm Also see COMBUSTION AIR and EXHAUST VENTING sections NOTICE Increasing the clearanc...

Страница 7: ...S Multiply the Cu Ft Hr value by 0 633 then use the table 4 Refer to the metric conversion factors listed in General Safety section for more SI unit measurements conversions To avoid equipment damage...

Страница 8: ...14 in W C 3 5 kPa All piping should be sized in accordance with the latest edition of ANSI Standard Z223 1 National Fuel Gas Code in Canada according to CAN CGA B149 See Tables 1 and 3 for correct gas...

Страница 9: ...ndard units are shipped for use on 115 volt 60 hertz single phase electric power The motor nameplate and electrical rating on the transformer should be checked before energizing the unit heater electr...

Страница 10: ...10 Figure 6...

Страница 11: ...11 Figure 7...

Страница 12: ...12 Figure 8...

Страница 13: ...13 FIGURE 9...

Страница 14: ...ertical combustion air pipes should be piped as depicted in Figure 10 7 The equivalent length of the vent system must not be less than 5 feet and must not exceed 50 feet 15 2m Equivalent length equals...

Страница 15: ...f the vent system that passes through a combustible material must be properly insulated Figure 10 Vertical Intake Vent Installation NOTICE Increasing the clearance distances may be necessary if there...

Страница 16: ...16 Figure 10A Horizontal Intake Vent Locations Figure 11 Vertical Vent Installation Figure 11A Horizontal Vent Installation...

Страница 17: ...t operates the vent and ignition systems to control the temperature of the space being heated NOTICE The thermostat must be mounted on a vertical vibration free surface free from air currents and in a...

Страница 18: ...TO UNIT WIRING DIAGRAM 8A MAIN GAS VALVE HONEYWELL 8B MAIN GAS VALVE WHITE RODGERS 9 HONEYWELL IGNITOR 10 HONEYWELL PILOT BURNER 12 FAN TIME DELAY SWITCH 13 HI LIMIT LOCATED ON REAR HEADER PLATE OF H...

Страница 19: ...of 2000 ft 610m or less SPECIAL ORIFICES ARE REQUIRED FOR INSTALLATIONS ABOVE 2 000 FT 610M When installed in Canada any references to deration at altitudes in excess of 2000 feet 610m are to be igno...

Страница 20: ...ical power to the gas unit heater 3 To clean or replace the main burners remove the bottom panel and compress the spring by moving the burner toward the manifold Slide the opposite end of the burner d...

Страница 21: ...URE SWITCH POWER VENT ASSY POWER VENT MOTOR FAN MOTOR GAS SUPPLY INLET AIR INLET FAN GUARD GAS VALVE RETAINER SPRING AIR SHUTTERS PILOT ASSY MANIFOLD Figure 15 Internal Furnace Assembly MAIN BURNERS F...

Страница 22: ...efer to Installation 7 Refer to Installation 1 Open all manual gas valves 2 Replace fuse or turn on power supply 3 Turn up thermostat 4 Check limit switch with continuity tester If open replace limit...

Страница 23: ...Do not ream 6 Refer to Operation 7 Check thermocouple connection and replace if defective 8 Eliminate drafts Refer to Installation 9 Inspect and correct all wiring 10 Inspect and correct ignition syst...

Страница 24: ...for short such as staples piercing thermostat wiring and correct Replace gas valve Refer to Operation 1 Be sure fan switch heater terminals are connected per diagrams 1 Refer to Operation 2 Check moto...

Страница 25: ...lve if not replace S8600 Igniter 1 Lengthen vertical run of flue pipe see venting 2 Burner orifice may be too large verify replace if req d 3 Increase air flow check fan size Check for proper voltage...

Страница 26: ...no adapter required 300 400 units 6 dia flue outlet Increaser required To be supplied by manufacturer 26 REF NO DESCRIPTION 1 Blower Housing Assembly 2 Speed Nut 3 Motor 4 Washer Plain 5 Plate Adapter...

Страница 27: ...en instructions or has been altered or modified in any way by any unauthorized person b to any expenses including labor or material incurred during removal or reinstallation of the Product c to any da...

Страница 28: ...nless you fully understand the controls GAS EQUIPMENT START UP GENERAL With power and gas off Make certain all packing has been removed Tighten all electrical terminals and connections Check damper li...

Отзывы: