Customer ____________________________________ Job Name & Number _________________________
PRE-INSPECTION INFORMATION
With power and gas off.
Type of Equip:
Unit Heater
Duct Furnace
Indoor
Rooftop
Serial Number
_________________________ Model Number __________________________
Name Plate Voltage:
_____________
Name Plate Amperage: _____________
Type of Gas:
Natural
LP
Tank Capacity _______ lbs.
Rating: _ _____ BTU @ ____ °F
_______ kg
_ _____ kw @ ____ °C
❐
Are all panels, doors, vent caps in place?
❐
Has the unit suffered any external damage?
Damage ______________________________
❐
Does the gas piping and electric wiring appear to be installed in a professional manner?
❐
Has the gas and electric been inspected by the local authority having jurisdiction?
❐
Is the gas supply properly sized for the equipment?
❐
Were the installation instructions followed when the equipment was installed?
❐
Have all fi eld installed controls been installed?
❐
Do you understand all the controls on this equipment? If not, contact your wholesaler or rep.
(DO NOT START this equipment unless you fully understand the controls.)
GAS EQUIPMENT
START-UP
GENERAL
With power and gas off.
❐
Make certain all packing has been removed.
❐
Tighten all electrical terminals and connections.
❐
Check damper linkages for tightness.
❐
Check all fans & blowers for free movement.
❐
Check all controls for proper settings.
❐
Check all set screws on blowers and bearings.
❐
Check belt tightness.
BLOWER
With power on and gas off.
❐
Check voltage L1 _____ L2 _____ L3 _____
❐
Check rotation of main blower.
❐
Check motor amps L1 _____ L2 _____ L3 _____
❐
Blower RPM _____________
❐
Check air fi lters. (Record quantity & size.)
Remarks:
_____________________________________________
__________________________________________________
__________________________________________________
GAS HEATING
With power and gas on.
❐
Inlet gas pressure.
____ in. W.C. or ____ kPa
❐
Pilot & main burner ignition.
❐
Manifold gas pressure. ____ in. W.C. or ____ kPa
❐
Cycle fi restat and/or freezestat.
❐
Check electronic modulation. Set at: __________
❐
Cycle and check all other controls not listed.
❐
Check operation of remote panel.
❐
Entering air temp. _____ °F or ____ °C
❐
Discharge air temp. (high fi re) ____ °F. or ____ °C
❐
External static pressure _________ in. W.C.
❐
Cycle by thermostat or operating control.