background image

2

TABLE OF CONTENTS

GENERAL SAFETY INFORMATION SEPARATED COMBUSTION DUCT FURNACE  ...................................1,2,3

 

SPECIFICATIONS ........................................................................................................................................4

 PERFORMANCE 

DATA 

................................................................................................................................5

 CLEARANCES 

.............................................................................................................................................6

 INSTALLATION
  Location 

...........................................................................................................................................6

  Ductwork, 

Air 

Flow 

........................................................................................................................6,7

  Suspension 

......................................................................................................................................7

  Electrical 

Connections, 

Wiring 

Diagrams 

.................................................................................8,9,10

  Combustion 

Air 

Piping 

...................................................................................................................11

  Exhaust 

Venting 

...................................................................................................................11,12,13

  Gas 

Piping 

.....................................................................................................................................14

  Pipe 

Installation 

...................................................................................................................15,16,17

 OPERATION
  Explanation 

of 

Controls 

.................................................................................................................18

 

 

Primary Air Shutter Adjustments ...................................................................................................18

  Shut 

Down 

.....................................................................................................................................18 

MAINTENANCE ......................................................................................................................................................19

COMPONENT PARTS .............................................................................................................................................20

TROUBLESHOOTING CHART   ........................................................................................................................21-25

WARRANTY  ...........................................................................................................................................................26

START UP/INSPECTION SHEET  ..........................................................................................................................28

GENERAL SAFETY INFORMATION

The duct furnace design is certifi ed by ETL for use with 
natural and LP (propane) gases. ANSI and NFPA 
Standards as well as Canadian installation codes 
referred to in this manual are the ones that were 
applicable at the time that the design was certifi ed. In 
addition, the duct furnace may be installed on the 
downstream side of a cooling coil, without need of a 
bypass duct.

If the unit is to be installed at altitudes exceeding 2,000 
feet (610m) above sea level, derate the input by 4% for 
each 1,000 feet (305m) rise above sea level. Special 
orifi ces are required for installations above 2,000 feet.

When units are installed in Canada, any reference to 
derations at altitudes in excess of 2,000 feet (610m) are 
to be ignored. At altitudes of 2,000 to 4,500 feet (610 to 
1372m), the units must be orifi ced for 90% of normal 
altitude rating, and be so marked in accordance with ETL 
certifi cation.

The following terms are used throughout this manual, in 
addition to the CSA requirements to bring attention to 
the presence of potential hazards, or to impor tant 
information concerning the product:

 Indicates an imminently hazardous 

situation which, if not avoided, will result in death, 
serious injury, or substantial property damage.

 Indicates an imminently hazard-

ous situation which, if not avoided, could result 
in death, serious injury, or substantial property 
damage.

 Indicates an imminently hazardous 

situation  which, if not avoided, may result in minor 
injury or property damage.

NOTICE: Used to notify of special instructions on 
installation, operation, or maintenance which are 
important to equipment but not related to personal 
injury.

Содержание QVSD-100

Страница 1: ...e This equipment has been test fired and inspected It has been shipped free from defects from our factory However during shipment and installation problems such as loose wires leaks or loose fasteners...

Страница 2: ...00 feet 610m above sea level derate the input by 4 for each 1 000 feet 305m rise above sea level Special orifices are required for installations above 2 000 feet When units are installed in Canada any...

Страница 3: ...eral safety information may result in extensive property damage severe personal injury or death This product must be installed by a licensed plumber or gas fitter when installed within the Commonwealt...

Страница 4: ...664 603 645 127 103 225 28 7 8 26 1 2 28 1 8 5 3 4 1 2 or 3 4 246 733 673 714 127 116 250 31 5 8 29 1 4 30 7 8 5 3 4 1 2 or 3 4 266 803 743 784 127 121 300 37 1 8 34 3 4 36 3 8 6 3 4 1 2 or 3 4 305 94...

Страница 5: ...7 0 873 50 0 02 3 930 11 0 48 250 250 125 200 2 056 90 0 09 9 251 20 1 96 73 2 36 6 58 6 0 970 50 0 02 4 366 11 0 49 300 300 150 240 2 467 90 0 10 11 101 20 2 00 87 8 43 9 70 3 1 164 50 0 02 5 240 11...

Страница 6: ...nce purposes AIRCRAFT HANGARS Separated Combustion Duct Furnaces must be installed in aircraft hangars as follows Duct furnaces must be at least 10 feet 3 05m above the upper surface of wings or engin...

Страница 7: ...ents AIR FLOW The installation is to be adjusted to obtain an air throughput within the range specified on the appliance rating plate Figure 2 Recommended Design for Field Installation of Ductwork for...

Страница 8: ...res 6 and 7 THERMOSTAT WIRING AND LOCATION NOTICE The thermostat must be mounted on a vertical vibration free surface free from air currents and in accordance with the furnished instructions Mount the...

Страница 9: ...9 Figure 6 Standard Wiring Diagram for Unit with Honeywell Ignition System...

Страница 10: ...10 Figure 7 Standard Wiring Diagram for Unit with Johnson Ignition System...

Страница 11: ...Use single wall pipe constructed of 26 gauge galvanized steel or material of equivalent durability and corrosion resistance for the combustion air system For installations in Canada use pipe construc...

Страница 12: ...uivalent must be used to seal each joint General Electric RTV 108 Dow Corning RTV 732 or an equivalent may be used instead of the tape 9 For horizontal vent systems longer than 5 feet 1 5m the system...

Страница 13: ...13 CAT 2766 CAT 2767 CAT 2765 Figure 8A Horizontal Intake Vent Locations Figure 9 Vertical Vent Installation Figure 9A Horizontal Vent Installation...

Страница 14: ...ws 1 Find cu ft hr by using the following formula Input Cu ft hr BTU Cu ft 2 Refer to table 4 Match Length of Pipe in Feet with appropriate Gas Input Cu Ft Hr figure This figure can then be matched to...

Страница 15: ...ce A ground joint union and a manual gas shutoff valve should be installed ahead of the unit heater controls to permit servicing The manual shutoff valve must be located external to the jacket See Fig...

Страница 16: ...Intermittent Pilot Ignition BURNER DRAWER COMMON PARTS 1 MAIN BURNERS 2 BURNER MANIFOLD 3 AIR SHUTTERS 4 BURNER SPRINGS 5 MAIN BURNER ORIFICE 6 TRANSFORMER 7 PILOT TUBING CONTROLS 8A MAIN GAS VALVE HO...

Страница 17: ...RILL GAS INPUT RATE Never overfire the duct furnace as this may cause unsatisfactory operation or shorten the life of the heater Check the gas input rate as follows Refer to General Safety Information...

Страница 18: ...rature of the space being heated NOTICE The thermostat must be mounted on a vertical vibration free surface free from air currents and in accordance with the furnished instructions INITIAL LIGHTING 1...

Страница 19: ...pplied with your unit MAINTENANCE PERIODIC SERVICE Open all disconnect switches and secure in that position before servicing unit Failure to do so may result in personal injury or death from electrica...

Страница 20: ...18 Tubing Aluminum Formation 19 Male Connector 20 Locknut 21 Hole Plug 22 Pressure Switch Cover 23 Drill Screw 24 Junction Box Base 25 Relay Purge NOTES 1 For item No 6 use counter clockwise rotation...

Страница 21: ...ice size and replace Refer to Operation 1 Close air shutter 2 Reduce pilot gas Refer to Operation 3 Replace orifice 4 Reset manifold pressure Refer to Operation Replace regulator section of combinatio...

Страница 22: ...hermostat 3 Check wiring diagrams 4 Check operation at valve Look for short such as staples piercing thermostat wiring and correct 5 Replace gas valve 6 Refer to Operation Table 7 Troubleshooting Guid...

Страница 23: ...onnections 2 Adjust thermostat for longer cycles Refer to Operation 3 Check for proper air supply across heat exchanger 4 Relocate thermostat do not mount thermostat on unit 5 Eliminate drafts Refer t...

Страница 24: ...ay is defective and must be replaced If 24V in not present check wiring per wiring diagrams 1 Be sure ventor relay heater terminals are connected per diagrams 2 Replace ventor motor 3 Check motor amps...

Страница 25: ...k motor voltage with fan running Should be 115 volts AC 3 Refer to Operation 1 Close thermostat contacts 2 Check for 24V across 24V terminals of S8600 3 Set gap to 0 1 4 Replace pilot assembly 1 Check...

Страница 26: ...val or reinstallation of the Product c to any damage due to corrosion by chemicals including halogenated hydrocarbons precipitated in the air d to any workmanship of the installer of the Product 3 Thi...

Страница 27: ...27...

Страница 28: ...equipment unless you fully understand the controls GAS EQUIPMENT START UP GENERAL With power and gas off Make certain all packing has been removed Tighten all electrical terminals and connections Chec...

Отзывы: