34
www.stenner.com
Econ FP
D
E
F
INSTALL NEW TUBE
1.
To install new tube, insert one fitting into slot, pull tube around the center of the roller
assembly and insert second fitting into the other slot.
Illustration D
2.
Align tube housing cover with track and slide over tube until fully closed.
Illustration E
3.
Plug the pump in.
4.
Run the pump to relax the tube. First, press and continue to hold , then press
, hold both buttons for one minute.
5.
To lock cover in place, press down on the cover while turning the vertical tab 180 degrees
from right to left. Install the Phillips head locking screw (CE models only).
Illustration F
6.
Take the pump out of standby. First, press and continue to hold
, then press
. Run the pump for one minute to verify operation. First, press and continue to
hold
, then press
, hold both buttons for one minute.
7.
Put pump in standby. First, press and continue to hold , then press .
Reconnect the suction and discharge lines.
8.
Prime pump. First, press and continue to hold , then press .
9.
Place pump in desired operating mode. First, press and continue to hold
, then
press or , release both buttons to select operating mode.
TUBE REPLACEMENT
continued
PRIME
PRIME
MODE
MODE
STBY
MODE
MODE
STBY
MODE
PRIME
MODE