Every hooklift installation is unique. However, certain guidelines exist that apply to every
model. Listed below is a general set of chronlological steps that may be followed when
installing a Stellar Hooklift. If any questions arise during the installtion process, feel free to
contact your local dealer or Stellar Customer Service at 800-321-3741.
15
Installation
15
Chapter 6 - Installation
Basic Installation Overview
1.
Clear the truck frame.
2.
Set the hooklift on the truck frame.
3.
Shorten the truck frame to within 2” from the rear of the loader.
4.
Install bumper.
5.
Drill mounting holes.. (See Mounting Kit PN 42010)
6.
Weld shear plates to base.
7.
Install tie-downs.
8.
Install tarper tower (If applicable).
9.
Mount hydraulic reservoir tank and valve bank.
10.
Mount PTO and pump.
11.
Run hydraulic hoses.
12.
Connect suction and pressure to the reservoir tank and valve bank.
13.
Install cab and PTO controls.
14.
Install mud flaps and fenders.
15.
Run Slider.
1/2” Plate
16.00
2-1/2” Pin
Bent 60°
12.00
41.63
Place at 45° Angle
8.25 Max
7.75 Min
Back of lift bar
to rear of A-Frame
3/8” Plate
126.00
Body Length
3/8” Plate
6.00
6.00
3.00
3.00
Body Tie Downs
3/4 x 4 x 4 Plate
2.00
Note: Cap all tube ends.
Drawing for Dimensional Purposes Only
Minimum recommended rail construction
per number of rear rollers on loader.
Slider34 6 x 3 x 3/8 & 1/2 x 3 Plt
6 x 3 x 3/8 & 1/2 x 3 Plt
Single
Double
61.75
To Bottom
of Hook
Subframe
Содержание Slider34
Страница 35: ...Installation 29 PN 44345 Hydraulic Schematic PN 44345...
Страница 37: ...Installation 31 PN 41133 Wiring Schematic PN 41133...
Страница 38: ...32 Slider34 Owner s Manual...
Страница 46: ...40 Slider34 Owner s Manual...
Страница 48: ...42 Slider34 Owner s Manual...