
1. Clean the chosen installation site of stones and other similar solid objects with a broom.
2. Set up the heat pump exactly as it will be used later.
3. Route the hose lines from the water treatment system to the heat pump installation site (see
Fig. F).
Ensure that none of the lines routed to the heat pump are under tension and that they do not
obstruct any walking routes.
4. Install a supply line for the electricity to the heat pump (see the chapter on “Technical data”).
Use an extension cable or a power socket of the suitable protection class for the ambient
conditions at the connection point!
The installation site is now prepared.
Installation
Mounting the adapters on the ends of the hose
1. Clean the connection points of the heat pump
1
, the adapters
2
and the ends of the water
hoses of coarse contamination.
2. Screw one adapter
2
onto the water connection outlet
6
.
3. Screw one adapter
2
onto the water connection inlet
7
.
4. Use a hose clamp
3
to connect the end of the drain hose to the adapter
2
on the water
connection outlet
6
(see Fig. 1).
5. Use a hose clamp
3
to connect the end of the supply hose to the adapter
2
on the water
connection inlet
7
(see Fig. 1).
The adapters are now connected to the ends of the hose.
F
1
3
2
37
Содержание 049273
Страница 2: ...2...
Страница 3: ...3 2 1 4 3...
Страница 4: ...Set C A B D D 9 5 8 7 6 14 17 15 16 18 POWER RESET TEST 11 12 13 10 5 4 4...