STEIN CURVED ACRYLIC Скачать руководство пользователя страница 2

2

WARRANTY

•  This covers faulty product. Check www.stein.co.nz for full details of warranty.

•  Any breakage on site will not be covered.

•  The installation must conform to the instructions for the warranty to apply.

HEALTH & SAFETY

•  Glass is heavy and requires two people to handle in most applications.

•  Always stand glass up after unpacking the components and use soft packing when 

in contact with hard surfaces. Take care not to strike an edge or corner on a hard 
surface.

•  All glass is toughened and cannot be reworked or drilled.

•  Wear protective gloves and eye protection.

•  Special care should be taken when drilling walls to avoid hidden pipes or electrical 

cables.

IMPORTANT PREPARATION STEPS!

1.  Solid fixing must be provided in the walls behind the wall channels. 20mm centre 

off outside of the acrylic tray.

2.  Plumbing fittings in the wall need suitable solid fixings.

3.  All Plumbing must be completed by a registered plumber and be in place prior to 

being lined.

4.  The wall lining must be a “Wet Area” grade to meet the Building Code.

5.  The floor must be level and flat without deflection. Walls must be plumb and 

surfaces flat.

6.  The Acrylic Tray and Liner comes with its own specific instructions.  

TOOLS REQUIRED

 (NOT SUPPLIED)

MATERIALS REQUIRED

 (NOT SUPPLIED)

WINDSOR SHOWER UNIT CURVED – 

ACRYLIC INSTRUCTIONS

WE RECOMMEND A TRADESMAN FAMILIAR WITH THIS TYPE OF INSTALLATION

•  Rags and suitable cleaning materials

•  Sika Silaflex NG Translucent

Содержание CURVED ACRYLIC

Страница 1: ...2020 IMPORTANT 1 When you receive your Windsor Curved Shower package please check for any freight damage 2 If damage has occurred advise your supplier within 8 hours 3 Do not install any faulty produc...

Страница 2: ...o avoid hidden pipes or electrical cables IMPORTANT PREPARATION STEPS 1 Solid fixing must be provided in the walls behind the wall channels 20mm centre off outside of the acrylic tray 2 Plumbing fitti...

Страница 3: ...x35 SCREW PACK PAR7296 14 9 Bump stop caps PAR6848 8 2 Wall plug concrete 6 10 Door panels 2 3 Screw cap covers 6 11 Top rollers PAR5124 4 4 Screws M4x10 6 12 Handle sets PAR5001 2 5 Wall channels PAR...

Страница 4: ...tray edge Diagram A This will allow for walls out of plumb protruding or curving inwards up to 4mm Greater variations to plumb will require recalculated reduction of Diagram A MINIMUM AND MAXIMUM TABL...

Страница 5: ...es to pre drill a 2mm lead hole in the lining A Ensure the spacer blocks are in position refer to assembly diagram on page 3 item 14 B Take the bottom curved horizontal rail 6 and install the two fixe...

Страница 6: ...ustrated Detailing of shower assembly A1 and A2 Fit the Door handles B1 and B2 Fit water deflectors to door edges and leading edge of fixed front panels C1 and C2 Fit magnetic seals to each door edge...

Страница 7: ...hower screen because water can build up over time within the wall channel and leak out of the shower area The screen is designed to allow the water to return into the shower area if any is present SCR...

Страница 8: ...8 CONTACT Freephone 0800 002 299 Phone 07 928 9990 Fax 07 928 9999 Email info stein co nz www stein co nz...

Отзывы: