
Page 26 of 38
939502326 Rev G
®
FLOOR TRACK FEATURES & INSTALLATION
1.
Use the IRID label to determine location of floor track per the site
layout drawing. Floor tracks are not used in door openings.
2.
Position floor tracks along the transfer line per the layout drawing.
3.
Install floor track springs into spring slots.
4.
Use the splice to align two (2) adjacent floor tracks.
5.
Lift vertical post up and into the hole within the splice.
1
IRID Label
Contains Width
Information
Acoustic Seals
Glide Slots
Power/Communication
Pass Through
Spring Slot
Splice
Floor Track Spring
Hook spring wire into
slot and twist until
spring stands as shown.
One per slot.
2
3
4
5
5