DESKING
3
MID STORAGE
2
c:scape
™
Desk and Supports
Page 1 of 24
939500367 Rev E
Table of Contents
BEAM
1
LOW STORAGE
5
PRIVACY
6
Furniture should be installed in sequence shown below.
POWER
4
Topic
If you have a problem, question, or request, call
your local dealer, or Steelcase Line 1 at
888.STEELCASE
(888.783.3522)
for immediate action by people who want to help you.
(Outside the U.S.A., Canada, Mexico, Puerto Rico,
and the U.S. Virgin Islands, call: 1.616.247.2500)
Or visit our website: www.steelcase.com
©
2009 Steelcase Inc.
Grand Rapids, MI 49501
U.S.A.
Printed in U.S.A.
Uncartoning and Supporting
Attaching and Adjusting Legs
Adjusting Height of Tether Brackets
Assembling Tether Brackets to Beam
or Storage Rail
Locating Tether Brackets to the Beam
(Perpendicular Application)
Locating Tether Brackets to the Beam
(Parallel Application)
Attaching Desk to Tether Brackets
Installation of Electrical Power and Data
Sub-Assembly of Worksurfaces
Installing Worksurface to Understructure
Ensuring a Level Surface
Ensuring a Smooth Sliding Surface
Installing Roller Channel Covers
Freestanding Application
Mounted Perpendicular to Beam or Storage
Back-to-Back Desks
Perpendicular to Beam
Benching - Mounted Parallel to Beam
Tethered to Storage
Most Common Desking Applications
2
3-4
5
6
7
8
9
10
11-12
15
15
16
17
18
19
20
13-14
23-24
21-22
Page
THIS INSTALLATION SEQUENCE IS HERE.