Commissioning
6.1
Testing
the
pump
CAUTION
Damage
to
pump
caused
by
dry
operation!
Make sure that the solar circuit is filled with heat
transfer fluid.
The controller casing is closed.
All connections are properly made.
The solar energy system is filled.
Connect the mains supply.
To switch on the pump, set the operating switch to
the upper position (on).
The display is lit with a red background.
on
appears in the display. After approx. 3 sec-
onds
on
flashes in alternation with the display.
To switch off the pump, set the operating switch to
the lower position (off).
The display is lit with a red background.
off
appears in the display. After approx. 3 sec-
onds
off
flashes in alternation with the display.
✓
✓
✓
T1
T2
on
T1
T2
on
T1
T1
T2
off
T1
T1
T2
off