background image

I N T E N D E D   U S E  

8

 

Installation overview 

General  

1.

 

Installation of this space blower should be carried out by trained and qualified 
personnel. 

2.

 

Any work related to installation of this space blower must comply with local code and 
regulation regarding safety and prevention of accidents. 

WARNING. Risk of electric shock

.  

Power supply must be disconnected during  installation. 

Main power should be connected only after all installation steps have been completed and 
properly verified. 

Installation steps : 

1.

 

Positioning & mounting of 

Space blower/humidifier

 

2.

 

If Remotely installed from humidifier  

a.

 

Steam line installation 

b.

 

Condensate line installation 

c.

 

Power supply installation 

d.

 

Control signal installation 
 

Installation – step 1 
IER Positioning & Mounting  

General guidelines for positioning 

Space blower

 should be positioned so that: 

 

Length of the steam line (or hose) is as short as possible, 

 

In case steam hose is used, the bend radius of 12in (300mm) is ensured 

 

Space blower is easily accessible for service 
 

CAUTION: Risk of water damage. 

Ensure that the surrounding area below and 

around the space blower will not be damaged by any possible water projection.

 

CAUTION: 

Do not install Space blower above any electrical equipment, as water leak 

from connection or abnormal operation can cause malfunction or short circuit. 

IER

 maximum ambient conditions: 

Temperature: 41°F to 122°F [+5 to +50°C] 
Relative Humidity: 90%RH max (non condensing) 
Ingress Protection for 

SB space blower

 standard enclosure: IP20 

section 

Содержание SB

Страница 1: ...OR STEAM HUMIDIFIER Installation and Operation Manual Please read and save this manual steamOvap technologies inc 9495 Charles de la Tour Montreal Qc H4N 1M5 Canada Tel 1 844 357 4477 www steamOvap com Rev 190201 SB ...

Страница 2: ...e blower must be done without written authorization from steamOvap Replacement of any defective components must be done with original component and spare parts from steamOvap representative Installation and Operation Manual Limitation This IOM is intended for trained and qualified personnel and must be applied along with the applicable local codes and regulations Any work related to installation o...

Страница 3: ...r Overview 6 Installation overview 8 Installation step 1 IER Positioning Mounting 8 Installation step 4 Steam line installation 11 Installation step 5 Power supply installation 12 Installation step 6 Control installation 13 Verification before start up 14 Start up normal operation 15 Maintenance service 15 Warranty 16 ...

Страница 4: ...lation or service Power supply connexion must be done by a trained and qualified electrician Any work related to power supply installation or service of this humidifier must comply with local code and regulation regarding safety and prevention of accidents Steam safety warning Any work related to steam line and condensate returns lines installation or service of such for this space blower for humi...

Страница 5: ...atches the purchase order and that all accessories are included 3 Any missing item should be reported as soon as possible to steamOvap or its representative and within 5 business days after receipt steamOvap will not assume any responsibility for missing item after this delay 4 Proceed carefully to unpacking and check that the humidifier and its accessories are not damaged in case of damage please...

Страница 6: ... 6 Space blower Overview Space blower Built in Remote Figure 1 SB Built in Overview Figure 2 SB Remote Overview Model designation and options codification Type Model S Small M Medium Nominal Voltage SB S 120 section 2 ...

Страница 7: ...0CFM 560m3 h 60W 120Vac Same as IER 0 6A 120Vac IER Dimensions Built in Remote Figure 3 Built in SB dimensions Figure 4 Remote SB dimensions Model Dimensions Steam Inlet Ø Net weight W H H1 D SBS Built in 20in 510m m 23in 585mm 8 5in 216mm 13in 330mm 1 5in DN40 8lb 3 6kg SBS Remote 9 25in 235m m 7in 178mm 9in 229mm SBM SBL Built in 23 5in 590m m 38in 965mm 10 5in 267mm 17 5in 445mm 2in DN50 10lb 4...

Страница 8: ...tion c Power supply installation d Control signal installation Installation step 1 IER Positioning Mounting General guidelines for positioning Space blower should be positioned so that Length of the steam line or hose is as short as possible In case steam hose is used the bend radius of 12in 300mm is ensured Space blower is easily accessible for service CAUTION Risk of water damage Ensure that the...

Страница 9: ...clearance on both side of the Space blower but it is a good practice to have a clearance of 4 to 8 in 100 to 200mm for ease of installation and service Front clearance of 80in 2000mm is required for steam absorption A top clearance is required of 24in 600mm for access and for steam absorption to avoid any condensing on the ceiling ...

Страница 10: ...ght of the Space blower 2 Mark the wall or support according to the above holes location and drill 2 holes to the wall or support as per the size of anchors and or screws 3 Use anchors of sufficient size at least 1 4in 6mm Insert those anchors and the 2 screws ensure that the screw heads extends 1 4in 6mm from the wall so that the Space box will be able to be hung on those 2 screws 4 With Top cove...

Страница 11: ...id steam pipe stainless steel or copper it is a good practice to install a small length of steam hose in between steam humidifier and rigid pipe and then Space blower for ease of installation and service Allow for a slope of 2 minimum 2 Secure all connexion with hose clamps 3 Connect the condensate return from Space blower and provide a condensate trap of 8in 200mm minimum as shown on above figure...

Страница 12: ...d regulation regarding safety and prevention of accidents SB electrical ratings Model Power Voltage Current Remote Built in SBS 34W 120Vac Same as IER 0 3A 120Vac SBM SBL 60W 120Vac Same as IER 0 6A 120Vac Built in SB Power supply is factory installed on Built in Space blower connected in the steam humidifier electrical panel see wiring diagram Remote SB Remote Space blower is provided with standa...

Страница 13: ...nstalled on Built in Space blower connected in the steam humidifier electrical panel see wiring diagram Remote SB Remote Space blower is provided with 15feet of control wire cable Connect the 2 wires as indicated below on the steam humidifier control PCB Red wire signal White wire signal Figure 8 Control connection ...

Страница 14: ...it Risk of malfunction Do not block steam outlet s Check list Mounting o Check mounting to verify that the Space blower is level and securely supported before start up Steam o Verify that all steam piping has been completed as recommended and that a slope of minimum 2 is provided o Ensure that there is no sag or kink or any possible obstruction in the steam line and condensate line Condensate retu...

Страница 15: ...l start Blower OFF delay o Fan Off delay can be set in the Humidifier settings tab on the humidifier user interface touch panel Please refer to steam humidifier IOM o When humidifier will stop steam production when demand is reached the blower will stop after this pre set delay is reached Maintenance service Space blower is equipped with an air filter located on the air inlet of the blower on the ...

Страница 16: ...warranty must be in writing signed by an officer of steamOvap steamOvap makes no warranty and assumes no liability unless the equipment is installed in strict accordance with installation manual in effect at the date of purchase and by qualified and trained personnel and in accordance to local codes and regulations steamOvap makes no warranty and assumes no liability whatsoever for consequential d...

Отзывы: